Laserfiche WebLink
0.PpUIN <br /> � ��.CpG <br /> c COUNTY OF SAN J OAQ U I N THOMAS R. FLINN <br /> DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O.BOX 1810- 1810 E.HAZELTON AVENUE MANUEL LOPEZ <br /> i STOCKTON.CALIFORNIA 95201 DEPUTY DIRECTOR <br /> C9' .... (2091 468-3000 <br /> �i'g6,0 J� STEVEN WINKLER <br /> FAX(209)468-2999 =J �'~ �'�l DF <br /> P_UTYDIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> April 17, 1996 SPR I �" 1996 <br /> "MMUNI!Y ot" <br /> M E M O R A N D U M f3L.A VAIG Lot vrivi"lcaO 4 <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Chandler T. Martin <br /> FROM: Tom M. Iwamiya, Senior Civil Engineer 1 <br /> Public Services Division <br /> SUBJECT: SA-96-18 A SITE APPROVAL APPLICATION FOR A CELLULAR <br /> COMMUNICATIONS FACILITY TO SHARE A PROPOSED MONO POLE TO BE <br /> INSTALLED BY ANOTHER COMMUNICATIONS COMPANY LOCATED ON THE <br /> WEST SIDE OF PATTERSON PASS ROAD, NORTH OF DELTA MENDOTA <br /> CANAL. (DISTRICT 5) . <br /> APPLICANT: Carl and Elizabeth Holdener APN: 209-090-03 <br /> INFORMATION: <br /> The site is not located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area. <br /> Patterson Pass Road has a variable existing right-of-way width and a <br /> planned right-of-way width of 110 feet . <br /> RECOMMENDATIONS : <br /> 1 . Encroachment permit shall be required for work within road <br /> right-of-way. <br /> (Development Title Section 9-1145 .4) <br /> 2 . The driveway approach shall be improved in accordance with the <br /> requirements of San Joaquin County Standards R-17 prior to <br /> issuance of the occupancy permit . <br /> (Development Title Section 9-1145 . 5) <br /> 3 . The Traffic Impact Mitigation Fee will be required for this <br /> development . The fee is due and payable at the time of building <br /> permit application. (The fee currently is $609 per 1, 000 gross <br /> square foot of building as Manufacturing in the Tracy area. The <br /> fee shall be automatically adjusted July 1 of eachy ear by the <br /> Engineering Construction Cost Index as published by the <br /> Engineering News Record. ) Contact the Department of Public works <br /> Public Facilities Division ( (209) 468-3055) for any alternate <br /> method of payment allowed for expansions/phasing. <br /> (Resolutions R-90-304, R-91-1025 , R-93-167, R-94-174 and R-95-650) <br /> TMI :RH:ti <br /> PS-6D187.:7 <br /> E: Manuel Lopez, Deputy Director/Development <br />