Laserfiche WebLink
fj - - <br /> 1 <br /> DEPARTMENT OF THE ARMY <br /> U.S.ARMY ENGINEER DISTRICT,SACRAMENTO <br /> CORPS OF ENGINEERS <br /> 1325 J STREET <br /> SACRAMENTO CA 95814-2922 <br /> REPLY TO <br /> AtTenmoN OF ' January 31, 2011 <br /> Regulatory Division SPK-2011-00095 <br /> Mr. Rick Griffin <br /> San Joaquin County Community Development Services <br /> Development Services Division <br /> 1810 East Hazelton Avenue <br /> Stockton, CA 95240 <br /> Dear Mr.Rick Griffin: <br /> We are responding to your January 21, 2011 request for comments on the San Joaquin <br />' County Religious Assembly Facility project. The project is located in Section 36, Township 3 <br /> North, Range 6 East, Mount Diablo Meridian, Latitude 38.0691244°, Longitude -121.2764772°, <br /> Lodi, San Joaquin County, California. Your identification number is SPK-2011-00095. <br /> The Corps of Engineers'jurisdiction within the study area is under the authority of Section <br /> 404 of the Clean Water Act for the discharge of dredged or fill material into waters of the United <br /> States„ Waters of the United States include, but are not limited to, rivers,perennial or <br /> intermittent streams, lakes,ponds, wetlands, vernal pools, marshes, wet meadows, and seeps. <br /> Project features that result in the discharge of dredged or fill material into waters of the United <br /> States will require Department of the Army authorization prior to starting work. <br /> To ascertain the extent of waters on the project site, the applicant should prepare a wetland <br /> delineation, in accordance with the "Minimum Standards for Acceptance of Preliminary Wetland <br /> Delineations", under "Jurisdiction" on our website at the address below,and submit it to this <br /> office for verification. A list of consultants that prepare wetland delineations and permit <br /> application documents is also available on our website at the same location. <br /> The range of alternatives considered for this project should include alternatives that avoid <br /> impacts to wetlands or other waters of the United States. Every effort should be made to avoid <br /> project features which require the discharge of dredged or fill material into waters of the United <br /> States. In the event it can be clearly demonstrated there are no practicable alternatives to filling <br /> waters of the United States, mitigation plans should be developed to compensate for the <br /> unavoidable losses resulting from project implementation. <br /> Please refer to identification number SPK-2011-00095 in any correspondence concerning <br /> this project. If you have any questions, please contact Julie Dickinson at 1325 J Street, Room <br />