Laserfiche WebLink
v ... <br /> Rick Griffin <br /> Community Development <br /> PA-0800323 <br /> RECOMMENDATIONS: <br /> 1. The Parcel Map requirement is waived. A Certificate of Compliance is required. A fee of$650 is required <br /> for the processing of the legal descriptions. The fee due will be based on the current fee schedule. <br /> (Development Title Section 9-890.4) <br /> 2. All easements of record shall be shown on the Parcel Map. (Development Title Section 9-910.20) <br /> 3. Perpetual nonexclusive access easements across pertinent parcels for the benefit of parcels not fronting a <br /> public roadway shall be described on the legal parcel descriptions for the Certificate of Compliance. <br /> Note: Any construction activity that results in the disturbance of at least one (1)acre of soil shall require a <br /> State NPDES construction permit. Dischargers whose projects disturb 1 or more acres of soil or whose <br /> projects disturb less than 1 acres, are required to obtain coverage under the General Permit for <br /> Discharges of Storm Water Associated with Constriction Activity(Construction General Permit, 99- <br /> 08DWQ) (www.swrcb.ca.gov/storrnwtr/gen_const.html#const permit). Construction activity subject to <br /> this permit includes clearing, grading and disturbances to the ground such as stockpiling, or excavation, <br /> but does not include regular maintenance activities performed to restore the original line, grade, or <br /> capacity of the facility. <br /> BD:DS <br /> \\sjpwgov.orglsh2res\DevServices\DPubSery\COMMENTS\MS1Yr 2008TA-0800323 PRE-APP.doc <br />