Laserfiche WebLink
C1 <br /> THOMAS R. FLINN pf <br /> P. O.BOX 1810-1810 E. HAZELTON AVENUE <br /> a <br /> - STOCK70N,CALIFORNIA 95201 <br /> DIRECTOR ARk (209)468-3000 FAX(209)468-2999 <br /> www.Sjgcv.org/pubworks <br /> THOMAS M. GAU <br /> CHIEF DEPUTY DIRECTOR <br /> MANUEL SOLORIO Working for 'Y,()" <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGERJANES <br /> BUSINESS ADMINISTRATOR <br /> November 24, 2008 <br /> MEMORANDUM <br /> TO: Rick Griffin, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Kevin Swanson <br /> FROM: Bill DuBois, Engineer III <br /> Public Services Division <br /> SUBJECT: PA-0800323; A Minor Subdivision pre-application to subdivide five(5) existing parcels totaling <br /> 983.78 acres into twenty-three(23)parcels totaling 40 acres or more each,located on the south <br /> side of Peltier Road, 212 feet east of Blossom Road, west of Interstate 5. <br /> (Supervisorial District 4) <br /> PROPERTY OWNER: Thompson&Folger Company APPLICANT: Wood Rodgers <br /> ADDRESS: 10020 W. Peltier Road APN: 011-060-01, 07 &08, and <br /> 011-110-02 &05 <br /> INFORMATION: <br /> The site is currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> The 100-year Flood Elevation will be approximately 8 feet NGVD. <br /> Peltier Road has an existing right-of-way width of 46-feet and a planned right-of-way width of 50-feet. <br /> Rond Road has an existing right-of-way width of 80-feet and a planned right-of-way width of 80-feet. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Regional Transportation Impact Fee will be required when parcels are developed. The fee is due and payable <br /> at the time of building permit application. <br />