Laserfiche WebLink
HAZARDOUS MATERIALS MANAGEMENT PLAN Page 2 of 3 <br /> (e.g. siren, public address system, verbal orders, etc.) <br /> EVACUATION ASSEMBLY AREA(S) (9) <br /> (Where employees are to report to) <br /> LOCATION OF HMMP FOR EMPLOYEE USE (10) <br /> SURROUNDING OCCUPANCIES AND LAND USE SECTION (11) <br /> The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th mile of our facility. <br /> Names of hospitals, schools, and day-care centers within 1/8th mile of our facility are also shown. This information <br /> should be provided to the 9-1-1 operator at the time of the initial notification. <br /> NORTH EAST <br /> SOUTH WEST <br /> SPILL CONTROL PROCEDURES SECTION <br /> r, The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th <br /> mile of our facility. Names of hospitals, schools, and day-care centers within 1/8th mile of our facility <br /> are also shown. This information should be provided to the 9-1-1 operator at the time of the initial <br /> notification. <br /> PILL CONTROL LEADER (12) <br /> (also oversees inspections of areas or <br /> systems vulnerable to earthquakes) <br /> HE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL (13) <br /> UTHORIZED SPILL CONTROL STRATEGIES (14) <br /> This business has authorized the above personnel to perform the action(s) indicated below to control spills of <br /> hazardous materials on its property. Persons performing these tasks will possess written procedures for performing <br /> hem and will have received training on the procedures and equipment needed prior to carrying them out. Locations of <br /> needed equipment are shown on the facility map.At a minimum our business must isolate the area of the spill and <br /> make notifications. <br /> PILLS OF LIQUID MATERIALS <br /> ❑ Plug and Patch Container Build Retention Dike <br /> ❑ Remove Sources of Ignition _1 Position Container so as to Stop Leak <br /> ❑ Reduce Pressure in Container/System ❑ Isolate Area and Make Notifications <br /> ❑ Neutralize Spilled Material —1 Secure System Valves and Closures <br /> ❑ Shutdown System Involved ] Apply Absorbent Material to Spill Area <br /> ❑ N/A <br /> RELEASE OF COMPRESSED GASES SPILLS OF SOLID MATERIALS <br /> ❑ Shut Off Valves/Systems ❑ Cover Spill to Prevent Spread <br /> ❑ Ventilate Area of Release ❑ Neutralize Spilled Materials <br /> ❑ Reduce Pressure in Container/System ❑ Position Container so as to Stop Leak <br /> ❑ Suppress Vapors with Water ❑ Place Spilled Material into Drum or Bag <br /> ❑ Isolate Area and Make Notifications ❑ Isolate Area and Make Notifications <br /> El Remove Sources of Ignition ❑ N/A <br /> ❑ N/A <br /> r <br /> http://si oesdata.org/gp_hmmp_detail.lasso?-Database=transaction+Plan+File&-Table=cdrnl... 3/6/2008 <br />