Laserfiche WebLink
2. Any loose areas of soil material evident in the footing excavations should be <br /> compacted to 90 percent of ASTM-D-1 557A prior to concrete placement. <br /> L IATIONS <br /> The materials encountered on the project site and utilized in our laboratory investigation are <br /> believed repremitative of the total area, however, soils vary in characteristics between test <br /> borings. This in no way constitutes certification of the subsurface soils. <br /> Since our investigation is basad on the site materials observed and selective laboratory testing <br /> and engineering analysis,the conclusions and recommendations are professional opinions. <br /> These opinions have been derived in accordance with current standards of practice and no <br /> warranty is either expressed or implied. <br /> It is recommended that North American Technical Services,be retained to provide continuous <br /> spoil engineering services during the construction operation. This is to observe compliance <br /> with the design concepts,specifications or recommendations and to allow design changes in <br /> the event that subsurface conditions differ from those anticipated prior to start of <br /> construction. <br /> The findings of this report are valid as of this date. Changes in the condition of a property <br /> can, however, occur with the passage of time,whether they be due to natural processes or the <br /> work of man on this or adjacent properties. In addition,changes in the state-of-art and/or <br /> Government Code may occur. Due to such changes,the findings of this report may be —/ <br /> invalidated wholly or in pan by changes beyond our control. <br /> It is the responsibility of the owners,or their representatives to ensure that the information <br /> and recommendations contained herein are brought to the attention of the appropriate parties <br /> and incorporated into the project's plans and specifications. It is further their responsibility <br /> to take the necessary measures to ensure that the contractor and his subcontract <br /> recommendations during construction. <br /> Abel R. Soares <br /> Registered Geotechnical Fogineer <br /> ROE#958 /t;.•r L�. 5�,r � ti� <br /> �,••7 Th <br /> J <br /> i NO.�Jg <br /> cr <br /> v <br /> •� �nT��GQ.`y�P <br /> a\ •. JF <br />