Laserfiche WebLink
'0`�"�'` COUNTY OF SAN JOAQU I N <br /> EUGENE DELUCCHI <br /> "- DEPARTMENT OF PUBLIC WORKS CHIEF DEPUTY DIRECTOR <br /> P O.BOX 181C - 1810 E HAZEL70N AVENUE THOMAS R.FLINN <br /> i STOCKTON,CALIFORNIA 95201 DEPUTY DIRECTOR <br /> Cq i F p RTk (209)468-3000 MANUEL LOPEZ <br /> FAX(209)468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> March 8, 199S <br /> V.,` 91995 <br /> M E M O R A N D U M �'JMMUnI'�IpI1�7 UC9CLurrauv I Ute'i <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Chandler T. Martin <br /> FROM: Richard W. Hieb, Engineering Assistant III <br /> Public Services Division Z"� <br /> SUBJECT: MS-9S-12 A MINOR SUBDIVISION APPLICATION TO SUBDIVIDE TWO <br /> EXISTING 10-ACRE PARCELS INTO FOUR S-ACRE PARCELS LOCATED <br /> ON THE SOUTH SIDE OF PELTIER ROAD, ONE-HALF MILE EAST OF <br /> BRUELLA ROAD. (DISTRICT 4) . <br /> APPLICANT: Charles Hammond APNS : 017-190-05 and <br /> 017-190-06 <br /> INFORMATION: <br /> The site is not located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area. In addition, the <br /> existing San Joaquin County and City of Stockton Flood Insurance <br /> Studies, which delineates flood risks, floodplains, and floodway <br /> areas, are currently being reevaluated. The reevaluation is being <br /> conducted by the Federal Emergency Management Agency, Region IX, <br /> Building 10S, Presidio of San Francisco, California 94219, telephone <br /> (41S) 923-7186 . The reevaluation may delineate additional flood <br /> risks . The official flood maps are available for review at the <br /> Department of Public Works, 1810 East Hazelton Avenue, Stockton. <br /> These flood maps will be updated when the reevaluation process is <br /> completed. <br /> Peltier Road has an existing right-of-way width of 80 feet and a <br /> planned right-of-way width of 84 feet . Lubell Lane (Pvt . Road) has an <br /> existing right-of-way width of 20 feet and a planned right-of-way <br /> width of SO feet . <br /> RECOMMENDATIONS : <br /> 1 . A Parcel Map is required. (Development Title Section 9-915 . 2) <br /> 2 . The Traffic Impact Mitigation Fee will be required when parcels <br /> are developed. The fee is due and payable at the time of <br /> building permit application. (The fee currently is $1, 900 per <br /> single-family dwelling unit in the Lodi area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News <br /> Record. ) <br /> (Resolutions R-90-304 , R-91-1025 , R-93-167 and R-94-179) <br />