My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010780
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PEZZI
>
9870
>
2600 - Land Use Program
>
PA-1600007
>
SU0010780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:34:44 AM
Creation date
9/8/2019 12:44:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010780
PE
2631
FACILITY_NAME
PA-1600007
STREET_NUMBER
9870
Direction
N
STREET_NAME
PEZZI
STREET_TYPE
RD
City
STOCKTON
Zip
95212-
APN
08902008
ENTERED_DATE
2/5/2016 12:00:00 AM
SITE_LOCATION
9870 N PEZZI RD
RECEIVED_DATE
2/5/2016 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PEZZI\9870\PA-1600007\SU0010780\APPL.PDF \MIGRATIONS\P\PEZZI\9870\PA-1600007\SU0010780\CDD OK.PDF \MIGRATIONS\P\PEZZI\9870\PA-1600007\SU0010780\EHD COND.PDF \MIGRATIONS\P\PEZZI\9870\PA-1600007\SU0010780\CERT OF OCCUPANCY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-1600007(SA) <br /> KATZAKIAN, TR., ET AL./AVANTI NUT CO., INC. <br /> Site Approval application no. PA-1600007 was approved by the San Joaquin County Community <br /> Development Department on April 15, 2016. The effective date of approval is April 25, 2016. This <br /> approval will expire on October 25, 2017, which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with (2) all necessary building.permits <br /> have been issued and remain in force, and (3) all necessary permits from other agencies have <br /> been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Stephanie Stowers [209] 468-9653) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on- <br /> site parking, landscaping, signs, existing and proposed utility services, and grading (refer to the <br /> "SITE PLAN CHECK LIST" for details). Foundation and soils investigation shall be conducted in <br /> conformance with Chapter 18 of the California Building Code at the time of permit application. A <br /> fee is required for the Site Plan review. (Development Title Section 9-884) <br /> b. IMPROVEMENT PLAN APPLICATION: Submit an "APPLICATION-SITE IMPROVEMENT PLAN: <br /> PRIVATE RIGHTS-OF-WAY' prior to the issuance of a Building Permit for Phase 1. A Site Plan <br /> depicting the proposed access and location of existing and proposed development, recorded deeds <br /> for all properties involved, and documentary proof of access is required as a part of the Improvement <br /> Plan application. A fee is required for the Site Plan review. (Development Title Section 9-884) <br /> c. APPROVED USE: This approval is for a storage facility to be constructed in four (4) phases over <br /> ten (10) years as shown on the Site Plan dated February 1, 2016. (Use Type: Agricultural <br /> Processing - Preparation Services) <br /> • Phase 1 (with building permits to be issued within eighteen [18] months from the effective <br /> date of approval) includes the construction of an 18,000 square foot walnut storage building. <br /> • Phase 2 (with building permits to be issued within two [21 years from the effective date of <br /> approval) includes the construction of an 18,000 square foot walnut storage building. <br /> • Phase 3 (with building permits to be issued within three [3] years from the effective date of <br /> approval) includes the construction of an 18,000 square foot walnut storage building. <br /> • Phase 4 (with building permits to be issued within ten [10] years from the effective date of <br /> approval) includes the construction of two (2) 18,000 square foot walnut storage buildings. <br /> The two (2) existing agricultural storage buildings are not to be used for the cold storage <br /> operation. <br /> d. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> PA-1600007 (SA) Conditions of Approval 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.