Laserfiche WebLink
.r <br /> Rick Griffin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-0900125 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application for Phase 11. The fee shall be automatically adjusted July 1 of each year by <br /> the Engineering Construction Cost Index as published by the Engineering News Record. (Resolution R-00- <br /> 433) <br /> 4. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application for Phase I. The fee is based on the current schedule. (Resolution R- <br /> 06-38) <br /> 5. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application for Phase II. The fee is based on the current schedule. (Resolution R- <br /> 06-38) <br /> 6. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable prior to issuance of the building permit for Phase 1. The fee shall be automatically increased on <br /> January 1 of each year through the year 2015 at the rate of 4.55 percent.) (Development Title Section 9-818.4 <br /> and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 7. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable prior to issuance of the building permit for Phase II. The fee shall be automatically increased on <br /> January 1 of each year through the year 2015 at the rate of 4.55 percent.) (Development Title Section 9-818.4 <br /> and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 8. A copy of the Final Site Plan shall be submitted prior to release of building permit for Phase I. <br /> 9. A copy of the Final Site Plan shall be submitted prior to release of building permit for Phase lI. <br /> 10. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon submittal <br /> of verification. <br /> 11. The developer shall provide drainage facilities and meet the requirements of San Joaquin County <br /> Development Standards to prevent the increased runoff release rate of storm water from discharging onto <br /> other properties and to prevent offsite sediment transport. Required retention basin capacity shall be <br /> calculated by a registered civil engineer, licensed contractor or licensed architect prior to release of Building <br /> Permit. (Development Title Section 9-1135) <br /> 12. The proposed project disturbs less than one (1) acre of ground and is not part of a larger plan of common <br /> development. The proposed project shall follow the practices in the County "Small Site Stormwater <br /> Management Plan". <br /> Informational Notes: <br /> (i.) This property is subject to the requirements of San Joaquin County Mosquito &Vector Control District(209- <br /> 982-4675) and the California Health and Safety Code for the prevention of mosquitoes. Best Management <br /> Practices (BMP) guidelines for stormwater devices,ponds and wetlands are available. <br /> BD: <br /> \\Pwsrvfp0l\shares\DevServices\DPubSery\COMMENTS\SA\YR 2009\PA-0900125.doc <br />