My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011390
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PEZZI
>
9982
>
2600 - Land Use Program
>
PA-1700020
>
SU0011390
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:08 AM
Creation date
9/8/2019 12:44:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011390
PE
2631
FACILITY_NAME
PA-1700020
STREET_NUMBER
9982
Direction
N
STREET_NAME
PEZZI
STREET_TYPE
RD
City
STOCKTON
Zip
95212-
APN
08902052
ENTERED_DATE
6/12/2017 12:00:00 AM
SITE_LOCATION
9982 N PEZZI RD
RECEIVED_DATE
6/9/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PEZZI\9982\PA-1700020\SU0011390\APPL.PDF \MIGRATIONS\P\PEZZI\9982\PA-1700020\SU0011390\CDD OK.PDF \MIGRATIONS\P\PEZZI\9982\PA-1700020\SU0011390\EHD COND.PDF \MIGRATIONS\P\PEZZI\9982\PA-1700020\SU0011390\EHD PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> Mo Hatef <br /> Community Development Department <br /> PA-1700020(SA) <br /> 5. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six(6)foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity shall <br /> be calculated and submitted along with a drainage plan for review and approval, prior to release of <br /> building permit. (Development Title Section 9-1135) <br /> 6. The proposed project disturbs less than one(1)acre of ground and is not part of a larger plan of common <br /> development. The construction phase of the proposed project shall follow best management practices <br /> as may be appropriate to minimize the discharge and transport of pollutants. (Title 5-Health and <br /> Sanitation,Division 10-Storm Water Management and Discharge Control) <br /> Informational Notes: <br /> (i.) A Solid Waste Diversion Plan for all applicable projects must be submitted to the Building Division <br /> of the Community Development Department prior to issuance of the building permit. Contact-the <br /> Solid Waste Division (468-3066)for information. <br /> (ii.) This property is subject to the requirements of San Joaquin County Mosquito &Vector Control <br /> District(209-982-4675) and the California Health and Safety Code for the prevention of mosquitoes. <br /> Best Management Practices(BMP)guidelines for stormwater devices,ponds and wetlands are <br /> available. <br /> AC: JR <br />
The URL can be used to link to this page
Your browser does not support the video tag.