Laserfiche WebLink
31SJCOG , Inc . <br /> S JCOG, Inc. <br /> San Joaquin Coundy Multi-Species Habitat Conservation &Open Space Plan <br /> 555 Fast Weber Avenue•Stockton,CA 95202• (209)235-0600 • FAX(209)235-0438 <br /> SJMSCP HOLD <br /> TO: Local Jurisdiction Community Development Department Planning Department. Building <br /> Department Engineering Department Survey Department Transportation Department <br /> Other: <br /> FROM: Laurel Boyd, SJCOG, Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUEA. BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement, the <br /> Applicant has agreed to: <br /> 1) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six(6)months from receipt of the ITMMs. <br /> If ITMMs are not signed within six months,the applicant must reapply for SJMSCP Coverage. Upon receipt <br /> of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This is the effective date <br /> of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered(the bond should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> c. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs <br /> first,the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> { b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> c. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> if <br /> at' Project Title: PA-1700020 (SA) <br /> f <br /> t Landowner: Vernon &Joanne Bava Family, LP Applicant: Avanti Nut Comoany. Inc. <br /> a6 i Assessor Parcel#s: 089-020-52 <br /> T , R Section(s): <br /> Local Jurisdiction Contact:Alisa Goulart <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP. <br />