My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003282
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2600 - Land Use Program
>
SA-90-06
>
SU0003282
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:44 AM
Creation date
9/8/2019 12:44:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003282
PE
2633
FACILITY_NAME
SA-90-06
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
ENTERED_DATE
11/7/2001 12:00:00 AM
SITE_LOCATION
1990 N PICCOLI
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PICCOLI\1990\SA-90-06\SU0003282\APPL.PDF \MIGRATIONS\P\PICCOLI\1990\SA-90-06\SU0003282\CDD OK.PDF \MIGRATIONS\P\PICCOLI\1990\SA-90-06\SU0003282\EH COND.PDF \MIGRATIONS\P\PICCOLI\1990\SA-90-06\SU0003282\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C ) All material transported off-site shall be either <br /> sufficiently watered or securely covered to prevent <br /> excessive amounts of dust . <br /> D ) The area disturbed by clearing , earth moving or <br /> excavation activities should be minimized at all times . <br /> E ) Instead of disking for weed control , the developer <br /> should mow, thereby leaving the ground undisturbed and <br /> with a mulch covering . <br /> After clearing , grading , earth moving , or excavation <br /> operations , during construction phase fugitive dust should <br /> be controlled using the following methods : <br /> A) All inactive portions of the construction site <br /> should be seeded and watered until grass growth is <br /> evident . <br /> B) All active portions of the site shall be <br /> sufficiently watered to prevent excessive amounts of dust . <br /> At all times , fugitive dust emissions should be controlled <br /> using the following procedures : <br /> A) On-site vehicle speed shall be limited to 15 mph . <br /> B ) All areas with vehicle traffic should be watered <br /> periodically for stabilization of dust emissions . <br /> C) Use of petroleum-based dust palliative shall meet <br /> the road oil requirements of San Joaquin County Rule <br /> 409 . 5 , Cutback Asphalt Paving Materials . <br /> D) Streets adjacent to the project site should be <br /> swept as needed to remove silt which may have accumulated <br /> from construction activities . <br /> At all times , ozone precursor emissions should be <br /> controlled using the following methods : <br /> A ) Equipment engines should be maintained in good <br /> condition and in proper tune as per manufacturer ' s <br /> specifications . <br /> B ) During the smog season (May through October ) , the <br /> construction period should be lengthened so as to minimize <br /> the number of vehicles and equipment operating at the same <br /> time . <br />
The URL can be used to link to this page
Your browser does not support the video tag.