Laserfiche WebLink
SA-99-02 r <br /> Page 2 <br /> D. Construct a water well under permit and inspection of the Environmental Health <br /> Division prior to occupancy. Should the number of non-resident individuals exceed <br /> 24 for at least 60 days per year, or the number of service connections exceed four, a <br /> yearly permit to operate a public water system will be required by the Environmental <br /> Health Division (San Joaquin County Development Title 22, Section 9-1120.2 and 9- <br /> 1115.9.). <br /> The supplier must possess adequate financial, managerial, and technical capability to <br /> assure delivery of pure, wholesome, and potable drinking water in accordance with <br /> San Joaquin County Development Title, Sections 9-1120.2 and—91115.9 and C.C.R., <br /> Title 22, and Health and Safety Code, Section 116525 through 116570. <br /> Note: The existing dwelling used as an office may have to be demolished in the fixture <br /> and the septic tank destroyed under permit and inspection. <br />