Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> SA-93-44 <br /> 2 . The frontage improvement for Pine Street shall be constructed <br /> in conformance with the standards for one-half of a 60-foot <br /> right-of-way local industrial street. The construction of the <br /> frontage improvements will be deferred upon execution by the <br /> owner of a Deferred Frontage and Roadway Improvement Agreement <br /> or a Secured Deferred Frontage and Roadway Improvement <br /> Agreement with a deposit equivalent to their estimated <br /> construction costs prior to approval of the Improvement Plan. <br /> (A $260. 00 fee currently is required for processing per <br /> Development Title Table 9-240. 2 in addition to a copy of the <br /> Grant Deed, recording fee and an estimate for the required <br /> frontage improvements. The estimate shall be prepared by a <br /> Registered Civil Engineer with a typical section drawing on a <br /> form to be supplied by the Public Works Department and <br /> submitted to the Public Works Department for approval . As an <br /> option the Department of Public Works will prepare the drawing <br /> and estimate for an additional fee of $115. 00 . ) <br /> (Development Title Section 9-1150.2) <br /> 3 . Encroachment permit shall be required for work within road <br /> right-of-way. <br /> (Development Title Section 9-1145. 2) <br /> 4 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of <br /> building permit application. (The fee currently is $1, 214 . 00 <br /> per 1, 000 gross square foot of building as "Manufacturing" in <br /> the Lodi area. The fee shall be automatically adjusted July 1 <br /> of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. ) <br /> (Resolution R-90-304 , R-91-1025) <br /> c: Manuel Lopez <br /> Deputy Director/DeveLopment <br />