Laserfiche WebLink
Rick Griffin <br /> COMMUNITY DEVELOPMENT <br /> PA-0800307 (SA) <br /> eperation. 1. ST-AA t�,pe truoks are te be used, a letter- r-eques4iiig designation of the pfoposed <br /> tefminal will be r-equir-ed prior-to issuanee of building peFmits. <br /> 3 Th� PPA4 A RlnAd ZAn�. tlqpq ornsses the par-eei shall be delineated on the sit�plan and wet stamped. <br /> The FE44A Fleedway thiat efesses the paFeel shall be delilleated an the site plan andwet stamped <br /> by a licensedcivil e <br /> Depar-tment ef Fish and Ga.— demonstrates the fight to disehaFge stefinwater- inte the <br /> Cal awr-as River-thfough the existing - <br /> Upon safis��en elf tff_� .1'eve r-eq irements, the following Gonditions of AppFoval shall apply. Additional <br /> ,.1: ati <br /> RECOMMENDATIONS: <br /> 1. An encroachment <br /> permit from Caltrans shall be required for work within SR 26 right-of-way. <br /> P .q g Y <br /> 2. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record.) (Resolution R-00-433) <br /> 3. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. The fee is based on the current schedule. (Resolution R-06-38) <br /> l <br /> 4. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable prior to issuance of the building permit. The fee shall be automatically increased on January 1 of each <br /> year through the year 2015 at the rate of 4.55 percent. (Development Title Section 9-818.4 and Resolutions R- <br /> 91-327, R-94-185 and R-97-5) <br /> i <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon submittal <br /> of verification. <br /> 7. Drainage from the site shall be retained on-site by a retention basin and meet the requirements of San Joaquin <br /> County Development Standards. Retention ponds shall be fenced with six (6) foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity shall be <br /> calculated by a registered civil engineer, licensed contractor or an architect prior to release of Building Permit. <br /> (Development Title Section 9-1135.9) <br /> a <br />