Laserfiche WebLink
f <br /> DATE: <br /> MEMORANDUM <br /> TO: Kerry Sullivan, Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Jeff Fisher <br /> FROM: Gabriel Karam, Senior Civil Engineer <br /> Ben Neeir, Engineer 11 <br /> Public Services Division <br /> SUBJECT: REVISION OF APPROVED ACTIONS REQUEST TO REVISE PUBLIC <br /> WORKS REQUIREMENT TO CONSTRUCT A PUBLIC WELL <br /> (CONDITION 2 F) TO WIT, SUSPEND CONSTRUCTION FOR SEVEN <br /> YEARS, AND ALLOW A MAJOR SUBDIVISION APPLICATION TO <br /> SUBDIVIDE 27 ACRES INTO 24 RURAL RESIDENTIAL LOTS. <br /> (DISTRICT 4) <br /> APPLICANT: Emile Atwood APN: <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. The 100 year Hood Elevation will be appreidmately feetNG39 <br /> In addition, the existing San Joaquin County and City of Stockton Flood Insurance Studies, <br /> which delineate flood risks, floodplains, and floodway areas, are currently being reevaluated. <br /> The reevaluation is being conducted by the Federal Emergency Management Agency, Region <br /> IX, Building 105, Presidio of San Francisco, California 94129-1250, telephone (415) 923-7186. <br /> The reevaluation may delineate additional flood risks. The official flood maps are available for <br /> review at the Department of Public Works, 1810 East Hazelton Avenue, Stockton. These flood <br /> maps will be updated when the reevaluation process is completed. <br /> Tudor Rose Glen has an existing right-of-way width of 50feet and a planned right-of-way width <br /> of 50 feet. <br /> RECOMMENDATIONS: <br /> The applicant shall enter into an agreement with San Joaquin County to defer construction of <br /> the water well to a future time when water demand warrants construction. <br /> Note: All other previous conditions shall still apply. <br /> CAMy Dwuments\comments\su-91-12.wpd <br />