Laserfiche WebLink
SEE DETAIL 1 - > <br /> --------------- <br /> ----------------------- ------ <br /> Pr o p os-e-d ddi t-io.1 nal_R c-a d­wa y­_E_ <br /> Use and Maintenance Easement- Proposed additional Roadway Easement emept__ <br /> Turning movemen <br /> for pipe lines and pump to allow for Truck ts 7 to allow or Truck Turning movements_-_- _..__ !i.) <br /> ------ ------ <br /> PL ----------- <br /> Ex 25' Roadway Easement <br /> ............ ............ <br /> ------- FA CFL TWO <br /> V NVYITD <br /> E x. FMD C C Droy, <br /> D.N. 2006--256678 T-1 1!:1 k <br /> Gone. SO Ex, S Pump- FT/BBO <br /> Construct New Drainage Pond-, O.N. PAR( <br /> -7TT- -­7 <br /> WF;;, EP ,�O@F�_ 7,9 X1 7 Wo <br /> nj ,,\ 2566 N� 2004 000722 FX, NOW <br /> ­T1 1 <br /> EP <br /> See Sheet 3 <br /> o, D <br /> -RiJW <br /> F1, 2,He_ Nmh]� qp <br /> "t Mdg. <br /> fy gm oonp V1 1EY RD <br /> baor <br /> 10'r, <br /> M"t Howe <br /> Barn <br /> /�--Prop6sed EP -7 Y <br /> GI 87el WA Offlee Ex SUR <br /> Ex, Leacb Area <br /> ----—----------_---- <br /> r PARCt-1 ONE <br /> r ank I 1 ­4 1 1 <br /> Ic" DIV, 2004-000722 <br /> box pd <br /> Roadw W'd <br /> Ding <br /> '7 <br /> See �heet 2 <br /> > <br /> rx, prwy > t� <br /> Z E X. <br /> s <br /> Proposed Leach Area Ex. K <br /> ea Re efve­1j5601-- SF 37"9 T_ <br /> EX. T <br /> Note: Parking to IJ6 r Rim-33 05 <br /> eldcated at'such' Ex. Fvul t, T Z <br /> > <br /> tiffie that the leach area.'reserve Wash <br /> III LU <br /> Slab <br /> is required for use, LU <br /> ........... Z Z <br /> < <br /> --------------- <br /> 0 <br /> rx� <br /> Ex. Roedwaq <br /> PA F Cf X -1 ONE <br /> CY) <br /> D N. 2006-7256678.. <br /> 7, <br /> PAVEMENT OVER <br /> E <br /> See Sheet 9 Roadway <br /> Easement <br /> -Propmed Roadway Easement <br /> E) N. 2TO 5 5 8 <br /> --Ie move Pence & Fill pond., See Sheet 2 <br /> eilsfing A <br /> See' Sheet 3 Ex 25' Roadway ozef <br /> dvay Fa nent <br /> —Proposed FScuaa EP - <br /> PARCFL 7WO <br /> 0V 2006-256671 Jell <br /> Ex. PL: <br /> JNny <br /> ............ ----------- -------- ------------------------ <br /> -------------------- J ----------- <br /> Mae, Panel <br /> ---------- <br /> r I ------- ------------_--_ ------- <br /> VINEYARD _ <br /> ----------- PP <br /> If <br /> ------------ ---—------ ------------- --------_--- <br /> fkI <br /> P <br /> ,> <br /> KEY, MAP <br /> Sclhl�-E: 1"=60' <br /> It <br /> -Ex 25' Roadway Easernent <br /> ­_------------ ----------------------------------- ---------­--------------- -------------- -----­­------- --------- Z, <br /> !_A�JIT UF <br /> � <br /> v I N- RFJREMOVE 154 ! EX, VINE ROW - ------ <br /> _ E------W__ <br /> P R 11 P I <br /> 7--7`7- <br /> ----------- _EP <br /> 7-7.77, <br /> 1 A I <br /> -CONST. AC PAVEMNT 2 EP ............ <br /> MATCH EX. PAVEMENT WPEN­- -MATCH EX, PAVEMENT NT WIDEN PAYE INT <br /> EP EX-700WAY C EX, ROADWAY MATCH EK PAVE9L 5 <br /> --------------- EX. OnWAY TO 2 <br /> ---------------- ------ ............ EP <br /> _77 <br /> lip <br /> ENT <br /> --CONST. AC PAVEM <br /> 13 VINEYARD Sign <br /> VINE ROW Fe <br /> I <br /> Ex.1rio op d <br /> Sig If <br /> _(V_ <br /> 11 p <br /> VITE -ARD <br /> Q) <br /> DETAIL 1 <br /> S�,','A L.E: 1.'"=3 0' <br /> Note: See Sheet 2 for Asphalt Concrete (AC) Pavement Section, <br /> GENERAL NOTES: <br /> 1. Work and materials shall conform to San Joaquin County Construction Specifications 6. Water used in any phase of construction, such as backfill compaction, dust control, testing SHEET NDE <br /> and Standard Plans, unless specifically shown otherwise on these plans, or other work herein required, shall be included in the unit price or lump sum bid for the SHEET 1 KEY MAP & DETAIL 1 <br /> 2, The contractor shall obtain all necessary permits for the project and be in respective item of construction or items of work, <br /> receipt of such permits and approved plans prior to beginning of construction, 7. This project is not designed to balance. Excess material shall become the property of the SHEET 2 PAVING PLAN <br /> 1 Construction staking shall be done by a Registered Civil Enginer or licensed Land Surveyor, Owner and stockpiled by Contractor on the site at location designated by owner, <br /> 4, Existing underground utilities are plotted from available records and field observations, 8. These Improwement Plans have been prepared with the intent that the firm of Baumbach k Piazza, Inc, will SHEET 3 DRAINAGE BASIN PLAN <br /> Existing underground utilities shall be protected. Utility agencies shall be notified and be performing the construction staking for the complete project, If, however, another engineering and/or <br /> allowed to mark their utilities in the field at least, 48 hours before excavation. Completeness surveying firm should be employed to use these plans for the purpose of construction staking, notice is hereby <br /> and accuracy of existing utility locations shown in these plans are not guaranteed. given that the firm of Baum ach k Piazza, Inc. will not assume any responsibility for errors or omissions <br /> Call USA: 1-800-227-.2600, if any, which might occur and which could have been avoided, corrected or mitigated if Baumbach k Piazza, <br /> Inc. had performed the staking work, or U Baumbach k Piazza, Inc, had been contacted prior to staking <br /> 5, The Contractor agrees that he shall assume sole responsibifty for job site conditions during regarding a.ny questions of ambiguity in the plans, interpretation of the plans, or engineering inconsistencies <br /> the course of construction of this project, including safety for allersons and property; contained fin these plans. <br /> that this requirement shall apply continuoUsly and not be limited te, normal working hours; <br /> and that the Contractor shall defend, indemnify and hold the Owner and the Civil Engineer 9. See sheet 2 for Paying notes and specifications, <br /> harmless from any and all liability, real or alleged, in connection with the performance 10. See sheet 3 for Grading, Dust Control and Sediment Control notes, <br /> of work on this project, excepting for liability arising from a sole negligence of the <br /> Owner or the Engineer, <br /> NO, REVISIONS DATE By DRAWN DES777 <br /> .............. ........................... EEREP <br /> S. .P S .PARED IN TH-E OFFICE OF: <br /> ------ PBAUMBACH & PIAZZA, INC. Prepared For: SHEET OF <br /> ........... .............................................. 1 3 <br /> ........................ ........... ................................. CIVIL.. ENC-,INEERS e SURVEYORS Phil Loduca Sr. <br /> ...................... APPROVED BY www.hpengineers.net 323 M Elm St. JOB <br /> ------- ...................... <br /> 200.368 6618 Lodi, CA 95240 SPL TRUCKING NO, 11005 <br /> DESIGNED UNDER THE SUPERVISION OF: ..........I.......11,___RCE <br /> ...RCE NO, DATE SITE & ROADWAY IMPROVEMENT PLANS FILE <br /> \im,jrnr Flan,6wg 10122111 3:01pm-VT)LISFIVA -n'IFS: 0231 A-10FOArg 023ITTATIM33 11005-TopoArg 2CT_Pr.dWg <br />