Laserfiche WebLink
(1) The proposed project will require plans prepared by a registered engineer or licensed <br /> architect and shall be submitted for review and approval and show the following: <br /> a) Any electrical, plumbing or mechanical work necessary to install the proposed <br /> equipment including any structures both site built and pre-manufactured. <br /> b) Support and anchorage of solar panels and rack system. <br /> c) Geotechnical report and site grading analysis. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Contact Staff: Alex Chetley, [209] 468-3000, see memo dated <br /> November 4, 2015) <br /> 3. ENVIRONMENTAL HEALTH DEPARTMENT (Contact Staff: Ted Tasiopoulos, [209] 953-7698, see <br /> memo dated October 30, 2015) <br /> 4. SAN JOAQUIN COUNCIL OF GOVERNMENTS (Contact Staff: Laurel Boyd, [209] 235-0600, see <br /> memo dated October 20, 2015) <br /> 5. LATHROP-MANTECA FIRE PROTECTION DISTRICT (Contact Staff: Steve Pickerill, [209] 858- <br /> 2311, see memo dated October 6. 2015) <br /> FOR NOTES AND INFORMATION ONLY: <br /> See South San Joaquin Irrigation District letter dated October 23, 2015. <br /> See Central Valley Regional Water Quality Control Board letter dated December 14, 2015. <br /> See F.E.M.A letter dated November 24, 2015. <br /> PA-1500114 (SA) Conditions of Approval 2 <br />