Laserfiche WebLink
Ted Tasiopoulos [EW <br /> From: Jose Luis Lines <jllires@immodoenergy.com> <br /> Sent: Thursday, December 15, 2016 12:04 PM <br /> To: Ted Tasiopoulos [EH] <br /> Cc: Marcus - Mirasol Development <br /> Subject: Re:sample tap <br /> Attachments: Well taps Report Manteca PV Solar Project.pdf <br /> Hi Ted, <br /> I send one of my guys to work on the sample well taps for our project at Manteca and I was also there trying <br /> to fit the sample taps as best as possible following your suggestions. <br /> I have put together all in the report I send you in attach. <br /> In well number 1 we cap the connection of the well with the existing underground pipe. The purpose of the <br /> wells is to serve water during construction for Dust Control and during C&M for filling the washing modules <br /> machine. This water will never serve for human uses. <br /> In the well number 2 we were not able to loose the 3" plug and we locate the tap as nearest as possible. <br /> Please, see the report and provide comments. <br /> Appreciate, <br /> Jose Luis Lires <br /> Director of Construction <br /> ImMODO Energy Services Corp. <br /> CA Contractor License#980711 <br /> 83 East Shaw Ave Suite 200 1 Fresno,CA 93710 <br /> Fax.+1559 553 8890 1 cell:+1415 590 0990 <br /> E-mail:illires0immodoenerev.com I Website:www.immodoenerzv.com <br /> From:Ted Tasiopoulos [EHj <ttasi000ulos@sicehd.com> <br /> Sent:Wednesday, November 9, 2016 3:43 PM <br /> To: immodo Lires <br /> Subject: RE:sample tap <br /> I attached a revised pdf showing good places to put a sample tap.Typically you put a sample tap on or before the <br /> Backlflow device (BFP),or somewhere between the BFP and the actual well head, but not after the BFP.Thanks. <br /> Ted <br /> 1 <br />