Laserfiche WebLink
S J C O G, Inc. <br /> 555 East Weber Avenue • Stockton,CA 95202 . (209)235-0600 • FAX(209)235-0438 <br /> San Joaquin County Multi-Species Habitat Conservation&Open Space Plan (SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG, Inc. <br /> To: Megan Aguirre,San Joaquin County,Community Development Department <br /> From: Laurel Boyd, SJCOG, Inc. <br /> Date: December 2, 2014 <br /> Local Jurisdiction Project Title: PA-1400235(MS) <br /> Assessor Parcel Number(s): 013-220-16 <br /> Local Jurisdiction Project Number: PA-1400235(MS) <br /> Total Acres to be converted from Open Space Use: 8.18 acres <br /> Habitat Types to be Disturbed: Multi-Purpose Open Space (C2) Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Ms. Aguirre: <br /> SJCOG, Inc. has reviewed the application referral for PA-1400235 (MS). This project consists of a Minor Subdivision <br /> application to subdivide an 8.18 acre parcel into one 5.0 acre financing parcel and a 3.18 acre Designated Remainder <br /> parcel. The project site is located on the southwest corner of State Route 99 West Frontage Road and Winery Road, Lodi <br /> (APN/Address: 013-220-16; 18915 N. State Route 99 West Frontage Road, Acampo). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> At this time the applicant is requesting a Minor Subdivision with no ground disturbance. Any future <br /> structures that require ground disturbance on this or subsequent divided parcels will be subject to <br /> participate in the SJMSCP and should be resubmitted to this agency. Current or future owners of this- <br /> or subdivided properties should be made aware of the conditions that are placed by the SJMSCP on <br /> future development on the created parcels. <br /> This Project is subject to the SJMSCP and is located in an unmapped land use area. Per requirements of <br /> the SJMSCP, unmapped projects are subject to case-by-case review. This can be up to a 90 day process and <br /> it is recommended that the project applicant contact SJMSCP staff as early as possible. It is also <br /> recommended that the project applicant obtain an information package. http://www.sicog.org <br /> After this project is approved by the Habitat Technical Advisory Committee and the SJCOG Inc. Board, the following <br /> process must occur to participate in the SJMSCP: <br /> ■ Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance <br /> • SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the project applicant prior to any <br /> ground disturbance but no later than six(6)months from receipt of the ITMMs. If ITMMs are not signed within six months,the applicant <br /> must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This <br /> is the effective date of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br />