Laserfiche WebLink
'OPgWry. <br /> TY OF SAN JOAQUIN <br /> COUNTY THOMAS R. FLINN <br /> DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O.BOX 1810—1810 E.HAZELTON AVENUE MANUEL LOPEZ <br /> STOCKTON.CALIFORNIA 95201 <br /> DEPUTY DIRECTOR <br /> CC-. 209)468-3000 STEVEN WINKLER <br /> PO FAX(209)468-2999 <br /> 10%% DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> "V <br /> DIRECTOR <br /> 1 4 <br /> October 25, 1996 <br /> 57996 <br /> MEMORANDUM lat v Q, <br /> oil <br /> TO: Thomas M. Gau, Senior Civil Engineer VIRGA; - <br /> Community Development Department <br /> CONTACT PERSON: Chandler T. Martin <br /> FROM: Tom M. Iwamiya, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-96-59 A SITE APPROVAL APPLICATION FOR A CELLULAR <br /> COMMUNICATION FACILITY WITH A 140-FOOT HIGH LATTICE <br /> TOWER FOR SEVERAL WIRELESS COMMUNICATION CARRIERS, <br /> LOCATED ON THE NORTHEAST SIDE OF STATE HIGHWAY ROUTE 99 <br /> EAST FRONTAGE ROAD, 3,800 FEET SOUTHEAST OF AUSTIN ROAD. <br /> (DISTRICT 5). <br /> APPLICANT: Amidi Partnership APN: 243-240-01 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. <br /> South 99 Frontage Road has an existing right-of-way width of 50 feet and a planned right-of-way <br /> width of 50 feet. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Section 9-1145.4) <br /> 2. The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $527.00 per <br /> 1.000 gross square foot of building as Manufacturing or$136.93 per daily trip-end <br /> 'D <br /> generated in the Ripon area. The fee shall be automatically adjusted July I of each year by <br /> the Engineering Construction Cost Index as published by the Engineering News Record.) <br /> Contact the Department of Public Works Public Facilities Division ((209) 468-3055) for <br /> any alternate method of payment allowed for expansions/phasing. <br /> (Resolutions R-90-304. R-91-1025, R-93-167, R-94-174 and R-95-650) <br /> TMI:RWH:ti <br /> PS-6119013 <br /> E: Manuel Lopez. Deputy Director/Development <br />