My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008676
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
24511
>
2600 - Land Use Program
>
PA-1100043
>
SU0008676
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:02 PM
Creation date
9/8/2019 12:56:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008676
PE
2631
FACILITY_NAME
PA-1100043
STREET_NUMBER
24511
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
APN
00516015 19
ENTERED_DATE
3/17/2011 12:00:00 AM
SITE_LOCATION
24511 N HWY 99
RECEIVED_DATE
3/17/2011 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\24511\PA-1100043\SU0008676\APPL.PDF \MIGRATIONS\N\HWY 99\24511\PA-1100043\SU0008676\CDD OK.PDF \MIGRATIONS\N\HWY 99\24511\PA-1100043\SU0008676\EH COND.PDF \MIGRATIONS\N\HWY 99\24511\PA-1100043\SU0008676\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. The use is compatible with adjoining land uses. <br /> • This Finding can be made because the proposed use will not interfere with nor alter the <br /> current land uses on adjacent properties. The project abuts State Route 99 to the north <br /> and east boundaries,State Route 99 West Frontage Road separates the west boundary <br /> from residential uses, and the parcel to the south is commercial. <br /> Conditions <br /> Use Permit Application No. PA-1100043 was approved by the Planning Commission on. The effective date <br /> of approval is. This approval will expire on, which is 18 months from the effective date of approval, unless (1) <br /> all Conditions of Approval have been complied with, (2)all necessary building permits have been issued and <br /> remain in force,and (3)all necessary permits from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled prior to <br /> the establishment of the use and the issuance of any building permits. Those Conditions followed by a <br /> Section Number have been identified as Ordinance requirements pertinent to this application. Ordinance <br /> requirements cannot be modified, and other Ordinance requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Contact Staff: Corinne King, [209]953-7509) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT". The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for the expansion of an existing truck stop facility as shown on <br /> the site plan dated March 15, 2011. The project will include the demolition of an existing 1,307 <br /> square foot fuel and convenience market and the construction of a new 5,800 square foot fuel <br /> and convenience market. (Use Type: Truck Sales and Services-Stops) <br /> Existing uses on site include an 872 square foot restaurant, two fuel island stations totaling 2,669 <br /> square feet, and overnight parking facilities for 25 trucks that are not a part of this project. <br /> Conditions of approval for Use Permit application No. UP-99-0011 are still in effect. <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> d. PARKING: Off-street parking shall be provided and comply with the following: <br /> 1) Al parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete to provide a durable, <br /> dust free surface. Bumper guards shall be provided where necessary to protect adjacent <br /> structures or properties. (Development Title Section 9-1015.5[e]) <br /> 2) A minimum of thirty-seven (37) parking spaces shall be provided, including two (2) accessible <br /> spaces; of which 1 shall be van accessible. Accessible spaces shall be located as close as <br /> possible to the primary entrance (C.C.R., Title 24). (Development Title Section 9-1015.3) (The <br /> Use Type: Truck Sales and Services-Stops requires 4 spaces per 1,000 square foot of building <br /> and 0.67 spaces per employee) <br /> San Joaquin County PA-1100043/SINGH <br /> Community Development Page 5 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.