Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> UP-99-11 <br /> 3. The frontage improvements for North 99 Frontage Road shall be constructed in <br /> conformance with the standards for one-half of a 60-foot right-of-way rural collector <br /> road. <br /> (Development Title Section 9-1150.2) <br /> 4. The Traffic Impact Mitigation Fee will be required for this development. The fee is <br /> due and payable at the time of building permit application. (The fee currently is <br /> $156.25 per daily trip-end generated in the Lodi area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has addressed the items on the attached Waste Plan Format for <br /> Development Projects. <br /> GK:RH:gn <br /> PS-9G037.Gl D <br /> E: Manuel Lopez, Deputy Director/Development <br />