My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004245
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25463
>
2600 - Land Use Program
>
PA-0300253
>
SU0004245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:51 PM
Creation date
9/8/2019 12:57:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004245
PE
2632
FACILITY_NAME
PA-0300253
STREET_NUMBER
25463
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
ENTERED_DATE
5/14/2004 12:00:00 AM
SITE_LOCATION
25463 N HWY 99
RECEIVED_DATE
6/1/2003 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\25463\PA-0300253\SU0004245\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerry Sullivan <br /> COMMUNITY DEVELOPMENT <br /> PA-03-253 (SA) <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $170.16 per additional <br /> daily trip-end generated in the Lodi area. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record.) (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066) that this development <br /> has met the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> DTP:SH:ar <br /> PACOMMENTS\SAWR 2003\PA-0300253(revprojdescp&sitepin).wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.