Laserfiche WebLink
pp4U1�!.•C <br /> COUNTY OF SAN JOAQUIN <br /> e; t� THOMAS R.FLINN <br /> DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O. BOX 1810- 1810 E. HAZELTON AVENUE <br /> �4�/coRaP STOCKTON,CALIFORNIA 95201 THOMAS M.GAU <br /> (209)468-3000 DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX(209)468-2999 <br /> DIRECTOR �1 <br /> STEVEN WINKLER <br /> FEB 2 DEPUTY DIRECTOR <br /> February 21, 2001 worn-o7ity <br /> MEMORANDUM Nt <br /> TO: Kerry Sullivan, Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Leanne Mueller <br /> FROM: Kd9 Gabriel Karam, Senior Civil Engineer��ti� <br /> Public Services Division <br /> SUBJECT: SA-01-03 A SITE APPROVAL APPLICATION FOR A NEW <br /> 31,500 SQUARE-FOOT BUILDING, HALF TO BE OCCUPIED BY OWNER <br /> FOR COUNTER TOP INSTALLING BUSINESS, REMAINING TO BE RENTED <br /> TO TENANT OF SIMILAR USE TYPE, LOCATED ON THE EAST SIDE OF <br /> STATE ROUTE 99 WEST FRONTAGE. (DISTRICT 4). <br /> APPLICANT: Bob Liebig and Duke Pilegaard APN: 005-141-34 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. The Flood Zone is "C" per Flood Insurance Rate Map 060299-0320 A <br /> dated 5-15-1980. <br /> North 99 Frontage West has an existing right-of-way width which varies and a planned <br /> right-of-way width of 56 feet. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $625.00 per <br /> 1,000 gross square foot of building as Manufacturing generated in the Lodi area. The <br /> fee shall be automatically adJ'usted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record.) A credit may be allowed if it <br /> can be verified that the existing development on this site was in operation on or after <br /> April 23, 1990. <br /> (Resolution R-00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has addressed the items on the attached Waste Plan Format for <br /> Development Projects. Final Site Plan is required upon submittal of verification. <br /> GK:BN:mr <br /> PS-113107-M113 <br /> E: Thomas M. Gau, Deputy Director/Development <br />