Laserfiche WebLink
Ms. Allen -- July 1, 2005 <br /> PA-0500371 (SA) (Pre-Application) Page 2 <br /> APN 193-050-06 LNG Facility <br /> Rule 4641 (Cutback, Slow Cure, and Emulsified Asphalt, Paving and Maintenance <br /> Operations). If asphalt paving will be used, then paving operations of this project will be <br /> subject to Rule 4641. This rule applies to the manufacture and use of cutback asphalt, <br /> slow cure asphalt and emulsified asphalt for paving and maintenance operations.. <br /> As noted in the pre-application, a District permit will be required for the Power module <br /> (Engine-generator set) listed on page 7. Also, for the Gas Well Operation Module noted on <br /> pages 8-10, the applicant should provide additional information regarding the <br /> specifications of this equipment by contacting the District's Small Business Assistance <br /> Office at 230-5888, or our Permit Services Section at 230-5900, a permit may be required. <br /> District staff is available to meet with you and/or the applicant to further discuss the regulatory <br /> requirements that are associated with this project. If you have any questions or require further <br /> information, please call me at (559) 230-5800. <br /> Sincerely,Lra <br /> Hector <br /> Senior Air Quality Planner <br /> Central Region <br /> c: file <br />