Laserfiche WebLink
SITE APPROVAL <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 EAST HAZELTON AVENUE, STOCKTON, CA 95105 <br /> TELEPHONE: (109) 468-1120 <br /> BUSINESS HOURS: 8:00 a.m. to 12 p.m.1 2:00 p.m. to 5:00 p.m. <br /> (Monday through Friday) <br /> APPLICATION;PROCESSING STEPS <br /> F2 �31UBMIT <br /> HECK WITH STAFF - Development Services Staff will explain the requirements and procedur7tou. <br /> YOUR APPLICATION - Applications are accepted by appointment only. Call 4683120 for anpointment When you apply,Ne all of the following: <br /> • FEE The staff will let you know the current cost of filing an appllcadon. Make checks payable to the San <br /> Joaquin County Treasurer. <br /> • FORM Seven(7)copies of the completed application information forms(attached)which all owners must <br /> sign. <br /> • SITE PLAN Seven(7)copies of a folded Site Plan(see attached)and two(2)copies of an 8-112- x 11"reduced <br /> copy of the plan. <br /> • HAZARDOUS One copy of a completed Hazardous Materials Disclosure Survey form(a copy of the form is <br /> MATERIALS attached). <br /> • DEED One copy of the recorded deed(s)of the property. <br /> • SERVICES If your project requires connection to public facilities,you must submit a'Will-serve"letter from <br /> the appropriate water,sewer and drainage entities at the time of filing. This letter must include a <br /> statement from the agency that they will serve the proposed development,and has,or will have, <br /> the capacity to provide such service. <br /> • APPLICATION Staff will check your application. If anything is missing,you will be notified in writing. The <br /> COMPLETE applicant will be sent a postcard once the application has been determined complete. Your <br /> application cannot be processed until it is complete.1 <br /> STEP 3 APPLICATION PROCESSING <br /> • CEQA The County will decide if the proposal will have an adverse effect on the environment. If there are <br /> no adverse effects,the application will be processed. If there are potential adverse affects,further <br /> environmental review will be required. Projects that have the potential to adversely affect the <br /> environment will require the preparation of an E.I.R This may extend the processing time. <br /> • REFERRALS AND Staff will refer the application to any County departments,other agencies and surrounding <br /> ACTION property owners affected by your proposal. At the end of a review and comment period the staff <br /> will approve your application if they can make required findings. If the staff cannot make the <br /> required findings,the application will be denied. Typically action will be taken on the project within <br /> 7.8 weeks. <br /> • FINAL ACTION The action of the staff can be appealed to the Planning Commission. The staff a action is final <br /> unless aDpealed. For further Information on the length of the appeal period,contact the staff. <br /> STEP 4 CONDITIONS AND ADDITIONAL PERMITS <br /> • CONDITIONS The staff will send you the final action and if it is approval it will list conditions,by department,that <br /> must be met before you can start your project <br /> • IMPROVEMENT In addition to the Site Plan,an Improvement Plan is frequently required as a condition of approval. <br /> PLANS This is an engineered plan showing drainage,grading,frontage improvements,access,on.and off- <br /> site service and utility facilities,landscaping and circulation/parking details. <br /> • DRIVEWAY Driveway Permits must be acquired from Community Development Department for any work <br /> PERMITS performed within the road right of way. If the project fronts on a state highway these permits are <br /> obtained from Caltrans. <br /> • SANITATION& Projects that will utilize new on-site sanitation disposal and/or on-site wells,must get permits from <br /> WELL PERMITS the Environmental Health Division. <br /> • BUSINESS If the project Involves a business,a Business license must be approved prior to starting <br /> LICENSES operation. Business License applications can be processed concurrently with the Site Approval <br /> application. <br /> • BUILDING If the project involves construction a building permit must be approved prior to commencement of <br /> PERMITS work. <br /> • OTHER PERMITS Frequently other local,sate andlor federal agencies will require <br /> permits prior to new uses being <br /> establishedesblished(e.g.Air Pollution Control District,Regional Water Quality Control Board or the <br /> Sheriffs Office). The Community Development Department will identify additional permits we are <br /> aware of that may be required for your project <br /> PA 3a.FRM Rev July 3. I•aa <br />