My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004651
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3291
>
2600 - Land Use Program
>
PA-0400532
>
SU0004651
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:53 PM
Creation date
9/8/2019 12:58:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004651
PE
2632
FACILITY_NAME
PA-0400532
STREET_NUMBER
3291
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
APN
17909012
ENTERED_DATE
9/30/2004 12:00:00 AM
SITE_LOCATION
3291 S HWY 99
RECEIVED_DATE
9/28/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\3291\PA-0400532\SU0004651\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerry Sullivan -2- <br /> COMMUNTfY DEVELOPMENT <br /> PA-04-532(SA) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is $971.00 per 1,000 gross square foot of building <br /> designated as Warehouse in the Stockton area. The fee shall be automatically adjusted July 1 of each year <br /> by the Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. The Water Supply Facilities Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. (The fee currently is$228.00 per 1,000 gross square <br /> foot of building designated as Warehouse. The fee shall be automatically increased on January 1 of each <br /> year through the year 2005 at the rate of 7.66 percent.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327,R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:DG:ar <br /> P�MA¢M91M"20 TA-0W533.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.