My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010821_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3515
>
2600 - Land Use Program
>
PA-1600040
>
SU0010821_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:20 PM
Creation date
9/8/2019 12:58:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0010821
PE
2631
FACILITY_NAME
PA-1600040
STREET_NUMBER
3515
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215-
APN
17909004
ENTERED_DATE
3/14/2016 12:00:00 AM
SITE_LOCATION
3515 S HWY 99
RECEIVED_DATE
3/14/2016 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\3515\PA-1600040\SU0010821\SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NLS§(0, SSS *mthe <br /> . Table 1 below summarizes the analyzed soil physical and chemical <br /> characteristics rretrieved soil sample: <br /> TABLE 1 <br /> SOIL PROFILE CHARACTERISTICS AND <br /> ANALYTICAL TEST RESULTS <br /> SAMPLE I.D.DEPTHSOILTEXIT RE. SOIL M IRATE: PH AND <br /> CLASSIFICATION NITROGEN(ON11AI (:A LION TV IIAN( E CAPACIII' <br /> In meq/1008 <br /> 0-2 FT DEPTH Clay(CL) 4 ppm NON 7.8 29.6 meq/1008 <br /> 2-3 FT DEPTH Clay Loam(CL-ML) 3 ppm NO -N 8.0 25.7 me /100 <br /> C. PERCOLATION TEST RESULTS <br /> SSS 6.2 The aforementioned percolation test boring was completed in the location depicted on <br /> thea ched Site Plan to assess the permeability of the proposed disposal area soils. <br /> SSS6.3 After drilling the test boring,the sidewall was scored with a pry-bar to open potentially <br /> sme sidewalls. Two inches of fine gravel was placed at the bottom and three-inch dia. perforated <br /> PVC pipe was inserted in the test boring. After drilling, the test boring was pre-saturated with 12 <br /> inches of water,24 hrs prior to the start of testing. Maximum soil saturation conditions were <br /> achieved to determine the saturated permeability of the indigenous clay loam soil. <br /> SSS§64� On August 18, 2016, percolation testing commenced at 0615 hrs. No standing water <br /> was o served after the 24-hr soak period. Consequently, EHD Perc Test Procedure#2 was <br /> conducted whereby testing was done over a four-hour period with readings taken every 30 minutes. <br /> A summary of the pert test results with corresponding application rates in gallons of effluent <br /> accepted per square foot of soil per day are illustrated in Table 2. The corresponding application rate <br /> was obtained from Page 24 of the OWTS Policy- Water Quality Control Policy for Siting. Design, <br /> Operation, and Maintenance of Onsite Wastewater Treatment Systems. <br /> TABLE 2 <br /> PERCOLATION TEST RESULTS WITH CORRESPONDING SOIL TYPE, <br /> PERCOLATION RATE AND APPLICATION RATE IN GALLONS /FT2/ DAY <br /> 36 INCH DEEP PERC TEST BORING 19.2 mi inch / 0.671 gallons/ft/day <br /> LEAN CLAY/LOAM <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.