Laserfiche WebLink
The proposed guard house will contain the restroom, consisting of a toilet and sink. It is my <br /> understanding that this will be the only wastewater fixture units on the developed property. <br /> Although the restroom is obviously for the use by the guards, according to EHD standards, people <br /> who are associated with a facility, whether they are employees are not, must have access to available <br /> restroom facilities. <br /> The day workers at offices are assigned 30 gallons per person per day per EHD Sewage Standards, <br /> which is extremely exorbitant and based on antiquated plumbing fixtures. Transient truck drivers <br /> cannot be considered office workers. <br /> There will be parking for a maximum of 41 trucks per the Application Referral, and therefore 41 <br /> drivers,who may potentially use the restroom at the beginning and end of each shift. Taking a <br /> reasonable usage factor of five gallons per day for each driver(2.5 gals AM, 2.5 gals PM), we find i <br /> 42 people (includes guard) x 5 gallons = 210 gpd. <br /> Total usage— 10 gpd x 5 days per week= 1,050 gpw x 50 wks per yr= 52,500 gpy. <br /> Wastewater Characteristics <br /> Blackwater will originate from toilets and graywater from hand washing. Additional wastewater <br /> constituents may consist of other liquids to the system, such as coffee,juices, etc. Industrial or <br /> commercial chemicals, solvents, etc. must not be introduced into the wastewater treatment system. <br /> The scientific literature cites nitrogen concentrations in domestic septic effluent typically ranging <br /> from 17 mg N/L for graywater basins, sinks, etc. to 140 mg N/L for blackwater toilet wastes. <br /> Therefore, considering a 38/52 percent usage for toilet and hand wash water volume, respectively, a <br /> value of 62 mg N/L (38% of 140 mg N/L plus 52%of 17 mg N/L) from the septic effluent will be <br /> used to calculate nitrate-nitrogen loading for this project(See Kaplan-Septic Systems Handbook,Pg. 147). <br /> B. CALCULATED NITRATE-NITROGEN LOADING ' <br /> NLS§ The calculated nitrate-nitrogen impact to the soil and ultimately to the groundwater <br /> is di tcult termine due to the large number of variables involved and variables unknown at this <br /> time. These include: 1.) Impact from upgradient nitrate sources, 2.) Variability in wastewater flows, <br /> nitrogen concentrations and dilution effects from stormwater recharge, 3.) Changes in groundwater <br /> directional flow and elevation, 4.)Denitrification potential within the soil environment and within the <br /> confined and/or unconfined aquifers. <br /> The Hantzsche/Finnemore Formula is used in this report to predict the average resultant concentration <br /> of nitrate-nitrogen in effluent recharge water from the proposed on-site septic system serving the <br /> restroom facilities. As calculated below,the property has been assessed on a total areal loading basis <br /> correlated with the total projected yearly wastewater low volumes calculated above. These two <br /> factors primarily estimate the average resultant concentration of nitrate-nitrogen in the recharge water. <br /> This concentration cannot exceed 10 ppm nitrate-nitrogen (45 ppm as nitrate). <br /> 6 <br />