My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005350
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4236
>
2600 - Land Use Program
>
PA-0300676
>
SU0005350
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:56 PM
Creation date
9/8/2019 12:59:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005350
PE
2632
FACILITY_NAME
PA-0300676
STREET_NUMBER
4236
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
APN
17917238
ENTERED_DATE
8/29/2005 12:00:00 AM
SITE_LOCATION
4236 S HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4236\PA-0300676\SU0005350\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-0300676 <br /> Barber <br /> Site Approval Application No. PA-0300676 was approved by the San Joaquin County Community <br /> Development Department on August 11, 2004. The effective date of approval is August 21, 2004. <br /> This approval will expire on February 20, 2006, which is 18 months from the effective date of <br /> approval, unless (1) all Conditions of Approval have been complied with, (2) all necessary building <br /> permits have been secured and remain in force, and (3) all necessary permits from other agencies <br /> have been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply- <br /> 1 COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Rick Griffin, [209]468-3154) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect- This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is a for multi-use facility to be constructed in two phases, as shown <br /> on the Revised Site Plan dated March 2, 2004. Phase One is for the conversion of an 1800-square- <br /> foot residence into an office for the sale of agricultural buildings and retail nursery, the conversion of <br /> two thousand square feet of cargo containers into storage buildings for construction contractors and <br /> welding services, the construction of three agricultural buildings for display purposes, parking for 12 <br /> trucks and trailers, and a retail nursery. (Use Types: Construction Sales, Nursery Sales and Service- <br /> Retail; Construction Services-Light; General Indusrial-Limited; Truck Sales And Services-Parking; <br /> and Automotive Sales and Services-Operable Vehicle Storage) Phase Two is for the construction of <br /> a 14,000-square-foot building for automobile repair and painting and the sales and service of farm <br /> machinery. (Use Types: Automotive Sales and Service-Heavy and Equipment Sales and Repair- <br /> Farm Machinery-Sales and Repair) <br /> c. COMPLIANCE DATE: Because this development is currently operating without the required <br /> permits, the following timeframe shall apply: <br /> (1) Building Permit plans shall be submitted within thirty (30) days from the date of approval. <br /> (2) The Building Permit shall be secured (issued)within sixty (60)days from the date of approval. <br /> (3) All Conditions of Approval shall be completed within 180 days from the issuance of the Building <br /> Permit. <br /> d. BUSINESS LICENSE: The applicant shall secure an approved Business License prior to the <br /> initiation of the use. (Section 7-1000 of the County Ordinance Code) <br /> Conditions of Approval - 1 - PA-0300676 <br />
The URL can be used to link to this page
Your browser does not support the video tag.