Laserfiche WebLink
J <br /> -2- <br /> Kerry Sullivan <br /> COMMUNITY DEVELOPMENT <br /> PA-03-52 (SA) a Road shall be constructed in <br /> 3. <br /> The frontage improvements for State Highway Route 99 Frontage <br /> local industrial street. The <br /> conformance with the standards for one-half of a 60-foot right-of-wayowner <br /> construction of the frontage improvements ment orl be d a Secured Deferred F ont geerred upon execution by eand Roadway <br /> Deferred <br /> improvement Agr prior to approval <br /> Frontage and Roadway P r Development Title <br /> improvement Agreement with a deposit equivalent to their estimated construction cos <br /> of the Improvement <br /> plan. (A$410.00 fee currently is required for processing Pe <br /> Table 9-240.2 in addition to a copy of the Grant Deedprepare( <br /> by a Registered an estimate <br /> ivil Engineer the required <br /> th a typical section <br /> improvements. The estimate shall be prep Y <br /> drawing on a form to be supplied by the Department of Public Works and submitted to the Department of <br /> Public Works for approval. As an option,the Department of Public Works will prepare the drawing and <br /> estimate for an additional fee of$175.00.) (The fee due will be based on the current fee schedule.) <br /> (Development Title Section 9-1150.2) <br /> 4. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently is $721.00 per 1,000 gross square foot of <br /> building designated as Manufacturing in the Stockton area. The fee shall be automatically adjusted July 1 <br /> of each year by the Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 5. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. (The fee currently is$212.00 per 1,000 gross square <br /> foot of building designated as Manufacturing. The fee shall be automatically increased on January 1 of <br /> each year through the year 2005 at the rate of 7.66 percent.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327,R-94-185 and R-97-5) <br /> 6. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 7. Verification shall be obtained from the Solid Waste Division(468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a State <br /> NPDES construction permit. <br /> DTP:DG:ar <br /> P.\COA4AENTSSA\"2003\PA-0300052 wpd <br />