My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004531
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4310
>
2600 - Land Use Program
>
PA-0300052 (SA)
>
SU0004531
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:52 PM
Creation date
9/8/2019 12:59:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004531
PE
2656
FACILITY_NAME
PA-0300052 (SA)
STREET_NUMBER
4310
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
APN
17917235
ENTERED_DATE
7/6/2004 12:00:00 AM
SITE_LOCATION
4310 S HWY 99
RECEIVED_DATE
6/30/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4310\PA-0300052\SU0004531\PUB REC REL APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerry Sullivan -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-03-52 (SA) <br /> 3. The frontage improvements for State Highway Route 99 Frontage Road shall be constructed in <br /> conformance with the standards for one-half of a 60-foot right-of-way local industrial street. The <br /> construction of the frontage improvements will be deferred upon execution by the owner of a Deferred <br /> Frontage and Roadway Improvement Agreement or a Secured Deferred Frontage and Roadway <br /> Improvement Agreement with a deposit equivalent to their estimated construction costs prior to approval <br /> of the Improvement Plan. (A $410.00 fee currently is required for processing per Development Title <br /> Table 9-240.2 in addition to a copy of the Grant Deed and an estimate for the required frontage <br /> improvements. The estimate shall be prepared by a Registered Civil Engineer with a typical section <br /> drawing on a form to be supplied by the Department of Public Works and submitted to the Department of <br /> Public Works for approval. As an option,the Department of Public Works will prepare the drawing and <br /> estimate for an additional fee of$175.00.) (The fee due will he based on the current fee schedule.) <br /> (Development Title Section 9-1150.2) <br /> 4. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently is$721.00 per 1,000 gross square foot of <br /> building designated as Manufacturing in the Stockton area. The fee shall be automatically adjusted July I <br /> of each year by the Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00433) <br /> 5. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. (The fee currently is $212.00 per 1,000 gross square <br /> foot of building designated as Manufacturing. The fee shall be automatically increased on January 1 of <br /> each year through the year 2005 at the rate of 7.66 percent.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327,R-94-185 and R-97-5) <br /> 6. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 7. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a State <br /> NPDES construction permit. <br /> DTP:DG:ar <br /> P2MU A-030 51.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.