My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005296
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
5480
>
2600 - Land Use Program
>
PA-0200364
>
SU0005296
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:56 PM
Creation date
9/8/2019 12:59:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005296
PE
2626
FACILITY_NAME
PA-0200364
STREET_NUMBER
5480
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
APN
08703018
ENTERED_DATE
8/15/2005 12:00:00 AM
SITE_LOCATION
5480 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\5480\PA-0200364\SU0005296\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STAFF REPORT " Use Permit <br /> Application Information <br /> Owner: Stockton Baptist Church &School <br /> Applicant: Aerie, Inc. <br /> File Number: PA-02-364 <br /> Location: On the east side of State Route 99 East Frontage Road, 2000 feet south of <br /> Hammer Lane, Stockton. <br /> Address: 5480 N State Route 99 East Frontage Road, Stockton <br /> General Plan: RNL Community: Morada <br /> Zoning: AU-20 APN: 087-030-18, 22, 23 <br /> Project Size: 5.6-acres Parcel Size: 5.6-acres <br /> Water Supply: Well Sewage Disposal: Septic <br /> Storm Drainage: On-site 100-Year Flood: No <br /> Williamson Act: No Supervisorial District: 3 <br /> Staff: Jennifer Jolley CEQA Determination: Negative Declaration <br /> Prosect Description <br /> This project is a Use Permit for the expansion of an existing church and school. The project will be <br /> completed in two (2) phases over a two (2) year period. Phase one includes the construction of a 1,320 <br /> square foot modular classroom and a 2,160 square foot modular classroom. Phase two includes the <br /> construction of a 2,160 square foot modular classroom and a 5,184 square foot sanctuary building for <br /> church services (Use Types: Religious Assembly-Community & Educational Services-General). The church <br /> will have a maximum seating capacity of 29.9 persons, and the school will serve a maximum of 150 <br /> students. <br /> Recommendation <br /> Approval. This project is consistent with the General Plan and Board Order B-00-437, pertaining to the <br /> General Plan 2010 Review, adopted April 11, 2000. <br /> San Joaquin County PA-02-364\Stockton Baptist Church & School <br /> Community Development Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.