Laserfiche WebLink
12/1212008 11:40 20947694429 KENNETH N MELEYCO PAGE 08 <br /> Fax cent by : 51984546069 [ SOKKERu DIUSON 1-15-86 14 :14 pg- 6/9 <br /> Mr.Mu HUtef t <br /> Proposed Waslevv ar Fn igdes for the Mad ria Center Of North Stockton <br /> Novomber 15.?.408 <br /> Informatibn is not included about who Prepared the design that is shown ar d whether <br /> the designer is a registered engineer. No calculations were provided for the proposed <br /> design. The proposed design is clearly inadequate. <br /> As discussed above, Chesney measured a percolation rate of 250 minutes liar inch in <br /> the shallow soils and said that the percolation rate in the shallow soils wa; "virtually <br /> non-existent". No percolation capacity should be allowed for the shallow leacl i lines. <br /> Page 18 of the County Standards allows a 36-inch seepage pit to be counted as 70-feet <br /> of leach line. The proposed six seepage pits thus would be the equivalent of,i•20-feet of <br /> leach line. This Is less than two-thirds of the 670-feet of leach line that Ch(,sney said <br /> was required and as discussed above, the flows are likely to be much h gher than <br /> Chesney estimated. <br /> Based on the minimal information currently available, it seems virtually eertair that there <br /> is insufficient land available at this site to accommodate the probable wastewater flows <br /> and it is also virtually certain that the proposed wastewater disposal system w II fail. <br /> This project must not be approved until a realistic operating plan explaining th ; probable <br /> usage of the facility and a reel engineering design is presented for review. <br /> It Is also noted that neither the current site plan nor the previous one allo'vs vehicle <br /> access to the septic tank. It will therefore be extremely difficult, it not imfossible to <br /> service the septic tank. The likely result of the lack of access will be that the lank is not <br /> pumped regularly and what little percolation capacity that might exist vrlll quickly <br /> become clogged. <br /> We look forward to the County staff addressing our concerns in your report. <br /> Very truly yours, <br /> Bonneau Dickson, PE <br /> CC: Ms_ Wendy Wyels, Regional Water Quality Control Board <br /> 6 <br />