My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007124
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8606
>
2600 - Land Use Program
>
PA-0800108
>
SU0007124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:00 PM
Creation date
9/8/2019 1:00:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007124
PE
2626
FACILITY_NAME
PA-0800108
STREET_NUMBER
8606
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
APN
08530032
ENTERED_DATE
4/9/2008 12:00:00 AM
SITE_LOCATION
8606 N HWY 99
RECEIVED_DATE
4/8/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\8606\PA-0800108\SU0007124\APPL.PDF \MIGRATIONS\N\HWY 99\8606\PA-0800108\SU0007124\CDD OK.PDF \MIGRATIONS\N\HWY 99\8606\PA-0800108\SU0007124\EH COND.PDF \MIGRATIONS\N\HWY 99\8606\PA-0800108\SU0007124\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k <br /> 5904 N.H Dorado Street,#D <br /> Stockton,OA 95207 <br /> (209)4774544 Phone <br /> (20S)477-9439 Fax <br /> Date: May 20,2008 <br /> San Joaquin County <br /> Community Development.Department <br /> 1810 Fast lgazelton Avenue <br /> Stockton,CA.95205 <br /> Attn: Mo Hatef,Associate planner <br /> RE Madina Center of North Stockton(PA-0$001.08) <br /> Dear Miss Hatef- <br /> Following;our meeting on May 14, 2008 with the county development coinmittee;the client understands w <br /> the need for noise and traffic study for the: project..`rherefore, the client authorizes the county to obtain <br /> propels frena qualified consultant for conducting traffic study as needed for this project and notify the <br /> client about flue scope and cost. of,'the study: The client has contracted with Bollard Acoustical <br /> Consultants,Inc.to conduct noise study per county requirement. <br /> Here.is a brief description of the anticipated daily usage of the proposed mosque upon completion. The: <br /> mosque will.be used every day of Che week for the five daily prayers..These prayers are the F'AJR (dawn) <br /> prayer, the ZC:lI.R. (raid-clay) prayer, the:ASR (.late after neon) prayer, the MAGHRIB (evening) prayer <br /> and the ESl lA (nightly) prayer. With the exception of the 7.uhr prayer, the timing of all prayers is based <br /> on the sunrise and. sunset times. The following table; shows the tuning, duration and the Expected <br /> attendance for these five prayers. <br /> DA'1LY PRAVERS _ <br /> Prayer Starting Time Duration Maximum Frequency No. of cars <br /> Attendance ex cted <br /> .Fajr About one hour before 20 minutes 10 people Daily 8 cars <br /> I sunrise <br /> Zuhr. 1:00 PM 20 minutes 10 people' Daily 8 cats <br /> .Asr About: one & a Dalt 15 minutes 10 people Baily 8 cars <br /> hour before sunset <br /> Maghrib 10 minutes after sunset 20 minutes 25 people Baily 15 cars — <br /> Esha About two hours after 30 minutes 25 people Daily l 5 ears <br /> sunset <br /> FRIDAY PRAYER: <br /> On Fridays,the Zuhr prayer is expected to attract moreworshippers from 200 to 249 people(70-83 cars). <br /> i The starting time for the Friday prayer is the same as the regular Zuhr prayer(1:00 PM) and will last for <br /> 25-30 minutes,Haus expected to be finished by 1:30.PM. <br /> (Continued on page 2) <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.