Laserfiche WebLink
11. Please include a copy of any studies ( soils, geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site. Traffic study by T.J.K.M. <br /> C. PROJECT CHARACTERISTICS <br /> 1. Services: Indicate how the following services will be provided <br /> for your project and availability of service. <br /> a . Water Supply: NPw well to San Joaquin County Std. <br /> b. Sewage Disposal: Santis tank and sLpaage pits. <br /> C. Storm Drainage: Detained on site and nipped to Little John Creek <br /> If an extension of any of the above is necessary, indicate <br /> which service(s) , what agency will be providing the <br /> service(s ) , and the distance of the extension(s ) : N/A <br /> d. Natural Gas : P.G.&E. <br /> e. Electricity: P.G.&E. <br /> f . Road/Access ( i .e. , paved, unpaved, public/private, road name) : <br /> WestFrontaee Road of State Rt. 99 <br /> g. Fire: French Camp Distance to nearest fire station: 6 miles t <br /> h . Schools: Stockton Unified <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject (specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures, number of trees removed, etc. ) . <br /> The proposed building site areas will be built-up approximately two feet to pre- <br /> vent them from flood' inrepresents approximately cubic yards o material. <br /> A proposed storm dnas <br /> is to be excavated which represents cubic yards_ <br /> Refer to site plan. <br /> 3. Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> Employee auto and delivery trucks <br /> Types of emissions and sources associated with project The only air <br /> emissions from this project would be the exhaust from various aircraft and test <br /> engines and automobiles. <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project Jet engine fuel. The amount consumed would vary with the <br /> amount of testing. <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? X NO YES <br /> 4 . How much agricultural land will be removed from production? <br /> Approximately 16 acres <br /> Irrigated Yes Not irrigated <br /> Site Approval Application - 7 - ( 6/86 ) <br />