Laserfiche WebLink
4�`" APPLICATION - SITE APPROVAL <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> •••�''G%F ORa`p <br /> FILE NUMBER: SA- PA- 1 1 O O 2 7 <br /> TO BE COMPLETED BY THE APPLICANT PRIOR TO FILING THE APPLICATION <br /> Owner Information Applicant Information <br /> Name: Jack Bozzano Name: Dillon & Murphy <br /> Address: 6880 Navone Rd. Address: PO Box 2180 <br /> Stockton,CA 95215 Lodi, CA 95241 <br /> Phone: 209-467-8320 Phone: 209-334-6613 <br /> PROJECT DESCRIPTION <br /> Proposal <br /> Description of the proposed project: A Phase 1 1,000 square foot storage building and a Phase 2 840 f <br /> temperature controlled building. The existing buildings total 35,400 sq. ft. <br /> Business name (DBA): Quality Packing & Shipping <br /> Employees/Customers/Deliveries per Work Shift" <br /> `(attach additional breakdownlexplanation for each phase of development,seasonal production,etc. if applicable) <br /> NOTE: if the proposed development is an addition to an existingfacilit ,only list the additional increases below <br /> Shift Hours I Days of the week Number of Employees I Customers per Shift Deliveries/Other per Shift <br /> 7:30 - 4:3 5 1/2 22 3 1 a day <br /> Materials/Equipment Used <br /> Describe equipment used in the project(include the number of automobiles,trucks,forklifts, etc.): <br /> Forklifts used on-site for existing buildings. No chane with proposed buildings. <br /> Describe materials produced,stored or used (all hazardous materials should be included): <br /> Olive storage and packing <br /> PROPERTY AND VICINITY DESCRIPTION <br /> Property Information <br /> Assessor Parcel Number(s) Property Size Number of Parcels Project Size Williamson Act Contract <br /> 101-120-31 6.99 Ac 1 6.99 Ac ❑Yes M No <br /> Property Address: <br /> Exlsting Land Uses <br /> On-Site Uses(Include Ag Crops): Olive Mill/Cold Storage <br /> Uses to the North: Industrial <br /> Uses to the East: Agriculture/Residential <br /> Uses to the South: A riculture <br /> Uses to the West: Agriculture <br /> F:IDEVSVC\Planning Application Farms\Site Approval.(Rev,wal 02-03-10) Page 2 of 9 <br />