Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-96-66 <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Section 9-1145.4) <br /> 2. The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is <br /> due and payable at the time of building permit application. (The fee currently is <br /> $584.00 per 1,000 gross square foot of building as Manufacturing or$151.96 per daily <br /> trip-end generated in the Stockton area. The fee shall be automatically adjusted July 1 <br /> of each year by the Engineering Construction Cost Index as published by the Engineering <br /> News Record.) Contact the Department of Public Works Public Facilities Division <br /> ((209) 468-3055) for any alternate method of payment allowed for expansions/phasing. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-174 and R-95-650) <br /> TMI:RWH:bn <br /> P"KMA3 <br /> E: Manuel Lopez, Deputy Director/Development <br />