Laserfiche WebLink
31SJC0G, Inc. <br /> S JC0G,Inc. <br /> San Joaquin County MrrUi-Speaer Habitat Conservation&Open Spate Plan <br /> 555 East Weber Avenue•Stockton,CA 95202•(209)235-0600• FAX(209)235-0438 <br /> SJMSCP HOLD <br /> TO: Local Jurisdiction: Community Development Department,Planning Department,Building <br /> Dapartment, Engineering Department Survey Department Transportation Department <br /> Other: <br /> FROM: Laurel Boyd,SJCOG,Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner?developer for this site has requested coverage pursuant to the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan(SJMSCP). In accordance with that agreement,the <br /> Applicant has agreed to: <br /> t) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to theprojectand must be signed by the <br /> project applicant prior to any ground disturbance but no later than six(6)months from receipt of the ITMMs. <br /> If rrMMs are not signed within six months,the applicant must reapply for SJMSCP Coverage. Upon receipt <br /> of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This is the effective date <br /> of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance offully executed ITMMs and prior to soy ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered(the bond should be valid for no longer than a 6 month period);or <br /> y, <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> -' c. Dedicate land in-lieu offees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date.of the ITMMs or issuance of a building permit,whichever occurs <br /> first,the project applicant must: <br /> i a. Pay the appropriate SJMSCP for the entirety ofthe project acreage being covered;or <br /> }„ b. Dedicate lend in-lieu of fees,either as conservation easements or fee title;or <br /> c. Pumhase approved mitigation bank credits. <br /> { _1 Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> Project Title: PA-1800075(IVIS) <br /> Ft ` Landowner: Marco A. Pacheco Applicant: Dillon&Murphy <br /> L <br /> ? Assessor Parcel#s: 103-290-28 <br /> T R ,Section(s): <br /> Local Jurisdiction Contact:Giuseppe Sanfilippo <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP. <br />