Laserfiche WebLink
V' ?< P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> THOMAS R. FLINN <br /> - DIRECTOR STOCKTON,CALIFORNIA 95201-3018 <br /> (209)468-3000 FAX(209)468-2999 <br /> www.co.san-joaquin.ca.us <br /> THOMAS M.GAU <br /> aw <br /> DEPUTY DIRECTOR b t <br /> MANUEL SOLORIO worlemg for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGER JANES <br /> BUSINESS ADMINISTRATOR <br /> January 11, 2006 <br /> MEMORANDUM <br /> TO: Chandler Martin,Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Kathy Allen <br /> FROM: Dean Gilman, Engineer IV <br /> Public Services Division <br /> SUBJECT: PA-05-762 A MINOR SUBDIVISION APPLICATION TO SUBDIVIDE A 4.85 ACRE <br /> PARCEL INTO TWO PARCELS. PARCEL ONE TO CONTAIN 2.27 ACRES AND PARCEL <br /> TWO TO CONTAIN 2.27 ACRES,LOCATED ON THE NORTH SIDE OF NORMAN <br /> AVENUE,APPROXIMATELY 640 FEET WEST OF SIBLEY AVENUE. <br /> (SUPERVISORIAL DISTRICT 4) <br /> PROPERTY OWNER: Lory Lucchesi APPLICANT: Siegfried Engineering, Inc. <br /> ADDRESS: 11573 E. Norman Avenue APN: 103-280-14 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Norman Avenue has an existing right-of-way width of 40 feet and a planned right-of-way width of 50 feet. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application. <br /> The fire road (including secondary access) shall be required to be improved in accordance with the requirements <br /> of San Joaquin County Fire Chiefs Association Standard 902.2.2. <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. Dedication to result in a twenty-five (25)foot wide right-of-way from the centerline of Norman Avenue to <br /> the property line shall be required across the frontage of Parcel 1 and 2. Dedication shall be made on the <br /> Parcel Map. (Development Title Section 9-1150.5) <br />