My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0001451 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RAINIER
>
2740
>
2600 - Land Use Program
>
LA-97-40
>
SU0001451 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:28:45 AM
Creation date
9/9/2019 8:59:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0001451
PE
2690
FACILITY_NAME
LA-97-40
STREET_NUMBER
2740
Direction
N
STREET_NAME
RAINIER
STREET_TYPE
AVE
City
STOCKTON
ENTERED_DATE
10/19/2001 12:00:00 AM
SITE_LOCATION
2740 N RAINIER AVE
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\RAINIER\2740\LA-97-40\SU0001451\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*fto" 14000 <br /> December 20, 1999 <br /> Burgess Res. <br /> Page 7 <br /> will provide the specified dry density after compaction. If necessary to obtain <br /> uniform distribution ofmoisture,water shall be added to each layer by sprinkling and <br /> the soil disked, harrowed, or otherwise manipulated after the water is added. The <br /> layers of the fill material shall not exceed 8 inches and each layer shall be compacted <br /> with suitable compaction equipment to provide the specified dry densities. <br /> (4) Required Densities <br /> The dry density of the compacted earth fill shall be at least 90 percent of the <br /> maximum dry density obtainable in the ASTM D 1557 Compaction Test. The value <br /> of the optimum moisture content and maximum dry density will be determined by <br /> the engineer and this information supplied to the contractor. <br /> (5) Seasonal Limits <br /> No fill shall be placed during weather conditions which will alter the moisture <br /> content of the fill materials sufficiently to make adequate compaction impossible. <br /> After placing operations have been stopped because of adverse weather conditions, <br /> no additional fill material shall be placed until the last layer compacted has been <br /> checked and found to be compacted to the specified densities. <br /> (6) Control of Compaction <br /> The density of the upper 6 inches of subgrade and of each layer of fill shall be <br /> checked by the engineer after each layer has been compacted, Field density test shall <br /> be used to check the compaction of the fill materials. Sufficient tests shall be made <br /> on each layer by the engineer to assure adequate compaction throughout the entire <br /> area. If the dry densities are not satisfactory, the contractor will be required to <br /> increase the weight of the roller,the number of passes of the roller,or manipulate the <br /> moisture content as required to produce the specified densities. <br /> SooT. <br /> � N <br /> Z W <br /> Q /. <br /> �JSoC. <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.