My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011462
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RAY
>
14647
>
2600 - Land Use Program
>
PA-1300118
>
SU0011462
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:10 AM
Creation date
9/9/2019 9:00:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011462
PE
2656
FACILITY_NAME
PA-1300118
STREET_NUMBER
14647
Direction
N
STREET_NAME
RAY
STREET_TYPE
RD
City
LODI
Zip
95242-
APN
05516029
ENTERED_DATE
8/14/2017 12:00:00 AM
SITE_LOCATION
14647 N RAY RD
RECEIVED_DATE
8/11/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 12\4580\PA-1300118\SU0011462\APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised Conditions of Approval <br /> Revisions of Approved Actions for previously approved Use Permit Application No. PA-1300118 was <br /> approved by the Planning Commission on . The effective date of approval is . This approval will <br /> expire on , which is 18 months from the effective date of approval, unless (1) all Conditions of <br /> Approval have been complied with, (2)all necessary building permits have been issued and remain in <br /> force, and (3)all necessary permits from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Me Hater Stephanie Stowers, 209-468- <br /> 0477 9653) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for the expansion of a large winery to be built in four phases <br /> over fifteen years as shown on the Revised Site Plan dated DeGen;ber 5, 201-3 October 3, 2017 <br /> (Use Type: Wineries and Wine Cellars—Winery, Large). Twenty-five marketing events per year are <br /> also approved with a maximum attendance of 450 300 people as shown on the proposed <br /> marketing plan dated July 15, 2013. <br /> Phase One, building permits to be issued within eighteen (18) months from the effective date of <br /> approval, includes the construction of a 7,000 square foot office building and the conversion of an <br /> existing 10,000 square foot agricultural building into a winery production building. <br /> Phase Two, building permits to be issued within five (5) years from the effective date of approval, <br /> includes the construction of a 24,000 square foot barrel warehouse building, a 600 square foot <br /> crush pad; wine tank farm expansion, and a 900 square foot restroom building. <br /> Phase Three, building permits to be issued within ten (10) years from the effective date of <br /> approval, includes the construction of a 24,000 square foot barrel warehouse building, a 24,000 <br /> square foot case goods storage building and wine tank farm expansion. <br /> Phase Four, building permits to be issued within fifteen (15) years from the effective date of <br /> approval, includes the construction of a 24,000 square foot barrel warehouse building. <br /> c. MARKETING EVENTS: Marketing Events are subjected to the following regulations: <br /> 1) A maximum of twenty-five (25) marketing events are permitted annually as a part of the <br /> proposed marketing plan dated July 15, 2013. <br /> 2) Each event shall have a maximum attendance of 450 300 people. <br /> 3) Marketing Events shall end by 10:00 p.m. (Development Title Section 9-1075.3[m][2]). <br /> San Joaquin County PA-1300118\Phillips <br /> Community Development Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.