My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005285
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
REEVE
>
21301
>
2600 - Land Use Program
>
PA-0500470
>
SU0005285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:35 AM
Creation date
9/9/2019 9:02:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005285
PE
2625
FACILITY_NAME
PA-0500470
STREET_NUMBER
21301
Direction
S
STREET_NAME
REEVE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
20918002
ENTERED_DATE
8/10/2005 12:00:00 AM
SITE_LOCATION
21301 S REEVE RD
RECEIVED_DATE
8/9/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\REEVE\21301\PA-0500470\SU0005285\APPL.PDF \MIGRATIONS\R\REEVE\21301\PA-0500470\SU0005285\CDD OK.PDF \MIGRATIONS\R\REEVE\21301\PA-0500470\SU0005285\EH COND.PDF \MIGRATIONS\R\REEVE\21301\PA-0500470\SU0005285\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
USE PERMIT _ <br /> t SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 <br /> BUSINESS PHONE: (209)468-3121 <br /> Business Hours: 8:00 a.m. to 5:00 p.m. (Monday through Friday) <br /> 4C%FORM <br /> APPLICATION PROCESSING''STEPS <br /> STEP 1 CHECK WITH STAFF - Development Services Staff will explain the requirements and procedures to you. <br /> STEP 2 SUBMIT YOUR APPLICATION -When you apply,file all of the following: <br /> FEE The staff will let you know the current cost of filing an application. Make checks payable to the San Joaquin <br /> County Treasurer. r <br /> FORM ASC 7 Cb�t �S C /�- � L�"T\ (---> ��/ �-'t (7 �1 <br /> Seven (7)copies of the completed appli`ption information forms(attached)which all ownefs must sign. <br /> SITE PLAN -- t. ?�— �fAILE Z G' t �l <br /> C , nd two (2)copies of a legibl <br /> AZARDOU One copy of a completed Hazardous Materials Disclosure Survey form (a copy of the form is attached). <br /> MATERI <br /> E One opyy of t�ecor�d ed(s)oft the property. <br /> SERVICES If your project requires connection to public facilities,you must submit a"will-serve"letter from the appropriate <br /> water, sewer and drainage entities at the time of filing. This letter must include a statement from the agency <br /> that they will serve the proposed development,and has,or will have,the capacity to provide such service. <br /> • PLICATION Staff will check your application. If anything is missing,you will be notified in writing. The applicant will be <br /> COMPLETE sent a postcard once the application has been determined complete. (Your application cannot be processed <br /> until it is com le . <br /> STEP 3 APPLICATION PROCESSING <br /> • CEQA The County will decide if the proposal will have an adverse effect on the environment. If there are no adverse <br /> effects,the application will be processed. If there are potential adverse effects,further environmental review <br /> will be required. Projects that have the potential to adversely affect the environment will require the <br /> preparation of an E.I.R. This may extend the processing time. <br /> • REFERRALS Staff will refer the application to any County departments, other agencies and surrounding property owners <br /> AND ACTION affected by your proposal. At the end of a review and comment period a staff report will be prepared and the <br /> Planning Commission will hold a public hearing. If the Commission can make the required findings,the <br /> application will be approved. Typically action will be taken by the Commission within 8 weeks after <br /> application. <br /> • FINAL ACTION The action of the Commission can be appealed to the Board of Supervisors. The Commission's action is final <br /> unless appealed. For further information on the length of the appeal period,contact the staff. <br /> STEP 4 CONDITIONS AND ADDITIONAL PERMITS <br /> • CONDITIONS The staff will send you the final action and if it is approved, it will list conditions, by department, that must be <br /> met before you can start project. <br /> • IMPROVEMENT In addition to the Site Plan, an Improvement Plan is frequently required as a condition of approval. This is an <br /> PLANS engineered plan showing drainage, grading,frontage improvements,access,on-and off-site service and utility <br /> facilities, landscaping and circulation/parking details. <br /> • DRIVEWAY Driveway Permits must be acquired from the Public Works Department for any work performed within the <br /> PERMITS road right of way. If the project fronts on a state highway these permits are obtained from Caltrans. <br /> • SANITATION & Projects that will utilize new on-site sanitation disposal and/or on-site wells, must get permits from the <br /> WELL PERMITS Environmental Health Division. <br /> • BUSINESS If the project involves a business,a Business License must be approved prior to starting operation. Business <br /> LICENSES License applications can be processed concurrently with the Use Permit application. <br /> • BUILDING If the project involves construction a building permit must be approved prior to commencement of work. <br /> PERMITS <br /> • OTHER Frequently other local, state and/or federal agencies will require permits prior to new uses being established <br /> PERMITS (e.g.Air Pollution Control District, Regional Water Quality Control Board or the Sheriffs Office). The <br /> Community Development Department will identify additional permits we are aware of that may be required for <br /> our eLoject. <br /> F\DEVSVC\Planning Application Forms\Use Permit (Revised 1-2-03) Page 1 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.