Laserfiche WebLink
Chandler Martin -2- <br /> COMMENTS ON DEVELOPMENT <br /> PA-05-470 (UP) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$1509 per 1000 gross square foot of building <br /> designated as Service Commercial in the Tracy area. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolutions R-00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> Note: Any construction activity that results in the disturbance of at least one (1) acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:SH:ar <br /> P:\COMMENTS\UP\YR 2005\PA-0500470 Pre-application—pd <br />