Laserfiche WebLink
TABLE OF CONTENTS <br /> SOIL SUITABILITY STUDY ................................................................................. 1 <br /> Introduction................................................................................................................. 1 <br /> Proposed Development.............................................................................................. 1 <br /> SiteDescription........................................................................................................... 1 <br /> PastUses of the Site ..................................................................................................2 <br /> Existing and Proposed Septic Tank Usage.............................................................. 2 <br /> ExistingSeptic System.............................................................................................. 2 <br /> ProposedSeptic System........................................................................................... 2 <br /> On-Site Septic Permit History ...................................................................................2 <br /> Existing Septic Tank Usage in the Vicinity................................................................2 <br /> Septic Permit History in the Vicinity ..........................................................................2 <br /> Expected On-Site Maximum Septic Tank Usage...................................................... 3 <br /> Ground Water Information .........................................................................................3 <br /> Depthand Gradient................................................................................................... 3 <br /> Potential Ground Water Contamination Issues....................... ................................. 3 <br /> On-Site Wells............................................................................................................ 3 <br /> WaterSample ...........................................................................................................4 <br /> Soil Profile and Geologic Information.......................................................................5 <br /> SoilBorings............................................................................................................... 5 <br /> Discussion of Soil Lithology ...................................................................................... 5 <br /> PercolationTest..........................................................................................................6 <br /> Preparation and Presaturation of Percolation Test Holes......................................... 6 <br /> Percolation Test Procedure....................................................................................... 6 <br /> Percolation Test Results ........................................................................................... 6 <br /> Discussion of Percolation Test Results..................................................................... 8 <br /> Discussion of Septic System Sizing.......................................................................... 8 <br /> CONCLUSIONS AND RECOMMENDATIONS.................................................... 9 <br /> LIMITATIONS..................................................................................................... 10 <br /> SELECTED REFERENCES ............................................................................... 11 <br /> LOGE 1602 <br />