My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005187
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2600 - Land Use Program
>
PA-0500403
>
SU0005187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:31 AM
Creation date
9/9/2019 9:06:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005187
PE
2605
FACILITY_NAME
PA-0500403
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
APN
24722018
ENTERED_DATE
7/6/2005 12:00:00 AM
SITE_LOCATION
26292 E RIVER RD
RECEIVED_DATE
7/6/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\26292\PA-0500403\SU0005187\APPL.PDF \MIGRATIONS\R\RIVER\26292\PA-0500403\SU0005187\CDD OK.PDF \MIGRATIONS\R\RIVER\26292\PA-0500403\SU0005187\EH COND.PDF \MIGRATIONS\R\RIVER\26292\PA-0500403\SU0005187\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hot Mix Asphalt <br /> Facilities 300 PROCESS AND CONTROL <br /> A normal batch cycle time is 45 to 60 seconds. This means that a batch mix <br /> facility can produce 60 to 80 batches per hour. Therefore, a facility with a 5 ton <br /> (10,000 lbs) pugmill can produce 300 to 400 tons per hour of hot mix asphalt. <br /> Pugmill The chamber in which the asphalt and aggregate are mixed is called a <br /> pugmill or mixer. A twin-shaft mixer is commonly used in modem HMA <br /> facilities. In a batch mix facility, this unit is mounted directly beneath the <br /> weigh hopper and asphalt distributor, see figure 301.4. These twin-shaft <br /> mixers consist of a lined mixing chamber with two horizontal shafts on which <br /> several paddle shanks, each with two paddle tips, are mounted' <br /> Figure 301.4 Asphalt Concrete Pugmill Mixer [3] <br /> Asphalt cement is introduced into the pugmill after the aggregate has been de- <br /> posited from the weigh hopper and dry-mixing is completed. Wet-mixing time <br /> begins when the asphalt cement is added.' <br /> The batch mixing time is the time period between the start of the opening of <br /> the weigh hopper dumping mechanism and the start of the opening of the <br /> discharge gate. The mixing time is the time necessary to obtain a homogene- <br /> A„nnc4 loon <br />
The URL can be used to link to this page
Your browser does not support the video tag.