Laserfiche WebLink
I � , <br /> APPLICATION-REVISIONS OF APPROVED ACTIONS <br /> Revision to QX 89-2 <br /> Proposal <br /> 1.Description of the proposed Revisions: <br /> Condition No. 4—Hours of Operation <br /> f <br /> Revise the Condition to permit: Occasional operation of the Asphalt Batch Plant, loaders,water truck, <br /> and Scale House between the hours of 9 PM and 5 AM to accommodate paving construction project <br /> requirements for projects that contain specifications that limit work to nighttime hours. We propose <br /> conditions as follows: <br /> ■ A submittal of project documentation such as bid specifications, contract terms, or other similar <br /> documents to the Community Development Department. <br /> ■ Notification to the Community Development Department of the proposed dates of operation. <br /> ■ Notification by mail to the residents within 1400 feet of the plant who are listed on the assessor's <br /> roll or who have requested notice. <br /> ■ During the extended hours of operation, the work will be limited to the Asphalt plant, loaders, <br /> water truck, and Scale house. <br /> ■ During the hours of darkness, mobile equipment will use strobe lights instead of audible backup <br /> alarms. <br /> E <br />