My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007300
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2600 - Land Use Program
>
QX-89-0002
>
SU0007300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 3:08:38 PM
Creation date
9/9/2019 9:06:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007300
PE
2656
FACILITY_NAME
QX-89-0002
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
APN
24722019
ENTERED_DATE
7/29/2008 12:00:00 AM
SITE_LOCATION
26292 E RIVER RD
RECEIVED_DATE
7/28/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\26292\QX-890002\SU0007300\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
629
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r^ <br /> f <br /> TABLE OF CONTENTS <br /> Munn & Perkins Quarry Excavation Permit <br /> Draft Environmental Impact Report <br /> Page <br /> Executive Summary ES-1 <br /> I 1. Introduction 1-1 <br /> i 1.1 Purpose of this Environmental Impact Report 1-1 <br /> r7 1.2 Project Overview 1-1 <br /> i 1.3 Type of Environmental Impact Report 1-2 <br /> . 1.4 Use of this Environmental Impact Report 1-2 <br /> 1.5 CEQA Environmental Impact Report Process 1-2 <br /> 1.6 Public Participation 1-4 <br /> '. 1.7 Organization of this Environmental Impact Report 1-5 <br /> 2. Project Description 2-1 <br /> 2.1 Introduction 2-1 <br /> 2.2 Project Location 2-1 <br /> 2.3 Existing Operations 2-2 <br /> 2.4 General Plan and Zoning Designations 2-2 <br /> 2.5 Adjacent Land Uses 2-4 <br /> '• 2.6 Project Objectives 2-4 <br /> I 2.7 Proposed Project Components 2-4 <br /> 2.8 List of Permits and Approvals 2-6 <br /> S <br /> 3. Environmental Setting, Impacts, and Mitigation Measures 3-1 <br /> 3.1 Visual and Lighting 3.1-1 <br /> 3.2 Transportation and Traffic 3.2-1 <br /> ! 3.3 Air Quality & Climate Change 3.3-1 <br /> 3.4 Noise <br /> �i 4. Alternatives 4-1 <br /> 4.1 Introduction 4-1 <br /> 4.2 Alternatives Evaluated in this EIR 4-3 <br /> i 4.3 Environmentally Superior Alternative 4-6 <br /> ' 5. Other CEQA Considerations 5-1 <br /> 5.1 Growth-Inducing Impacts 5-1 <br /> { 5.2 Cumulative Impacts 5-2 <br /> 5.3 Significant Unavoidable Adverse Impacts 5-3 <br /> 5.4 Significant Irreversible Environmental Changes 5-4 <br /> 5.5 Effects Not Found To Be Significant 5-4 <br /> 5.6 References 54 <br /> Munn&Perkins Ouar{y Excavation Permit I ESA 1211088 <br /> Draft EIR April 2011 <br /> „ 4 <br /> { <br />
The URL can be used to link to this page
Your browser does not support the video tag.