Laserfiche WebLink
Munn&Perkins Quarry Excavation Permit <br /> In addition to the above-listed criteria,the following criterion is derived from common <br /> engineering practice to apply to the project-specific analysis presented herein: <br /> g. Cause substantial damage or wear of public roadways by increased movement of heavy <br /> vehicles. <br /> 3.2.3 Discussion of Criteria with No Transportation Traffic <br /> Impacts <br /> Analysis of the setting and Project characteristics relative to the significance criteria shows that <br /> the Project would have no impact on Transportation/Traffic with respect to criteria c),d),e),f)or g). <br /> The reasoning supporting this conclusion is as follows: <br /> C) The Project would not result in a change in air traffic patterns. j"y <br /> The Project is not located close to any airport, and would not place any object within the <br /> flight path for airplanes in the area. The Project would not result in a change in air traffic <br /> patterns, including either an increase in traffic levels or a change in location that results in <br /> substantial safety risks; therefore,no impact would occur. <br /> d) The Project would not result in an increase in traffic hazards due to a design feature. <br /> The proposed nighttime operations of the Project would not involve redesign or <br /> reconfiguration of roadways. There would be no incompatible uses nor would there be <br /> roadway design changes. Therefore,the Project would have no impact on road hazards. <br /> e) The Project would not result in inadequate emergency access. <br /> Vehicle access to and from the Quarry site is via an ingress/egress access roadway that <br /> intersects East River Road;there are no other auxiliary roadways that provide access to <br /> the site.The Project would neither change this condition,nor contribute to any adverse <br /> consequences of the lack of secondary(emergency)access. Therefore,the Project would <br /> not result in inadequate emergency access. <br /> f) The Project would not conflict with adopted policies,plans, or programs supporting <br /> alternative transportation. <br /> The Project would not directly or indirectly eliminate alternative transportation corridors <br /> or facilities(e.g., bike paths, lanes,bus turnouts, etc.). In addition,the Project would not _ <br /> include changes in policies or programs that support alternative transportation. Therefore, <br /> the Project would not conflict with adopted policies,plans, or programs regarding public <br /> transit,bicycle,or pedestrian facilities, or otherwise decrease the performance or safety <br /> of such facilities. <br /> Munn 8 Perkins Quarry Excavation Permit 3.2-6 ESA 1211066 <br /> Draft EIR April 2011 <br />